E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME:Huntley Higgins, P.E., PMP 13. ROLE IN THIS CONTRACT:
<br />Civil Engineering Design
<br />14. YEARS EXPERIENCE
<br />a. TOTAL:22 b. WITH CURRENT FIRM:12
<br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126
<br />16. EDUCATION (Degree and Specialization):
<br />2001 Master of Applied Science in Civil/Environ. Eng. -University of Toronto
<br />1995 Bachelor of Science in Civil Engineering- University of the West Indies
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida 60726
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):
<br />Project Management Professional (PMP)
<br />American Water Works Association (AWWA)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)Biscayne Boulevard 12-inch Force Main Extension Improvements – City of North Miami, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION
<br />2015
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager and Senior Civil Engineer responsible for the design, permitting and construction administration of 5800 LF of 12-inch force
<br />main along Biscayne Boulevard, which is maintained by the Florida Department of Transportation (District VI), between NE 105th Street to NE
<br />119th Street and then west to NE 16th Avenue. The project has an estimated construction cost of approximately $1.5 Million. The goal of the
<br />project is to provide the City with additional sewer conveyance capacity and meet regulatory operation criteria.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)Washington Park Master Plan – City of North Miami Beach, North Miami Beach, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager and Senior Civil Engineer responsible for developing a Master Plan for the redevelopment of a 2.1 acre park within the City of
<br />North Miami Beach. The design incorporated elements such as Crime Prevention Through Environmental Design (CPTED) concepts. The
<br />proposed park facilities include recreational fields for various sporting activities, outdoor pools, playgrounds, basketball courts and on-site
<br />parking facilities. A new state of the art recreational community center was proposed that houses a day care facility, ceramics studio,
<br />gymnasium, and other essential programs. In addition, several green initiatives were proposed to promote water and energy conservation
<br />practices. The construction cost for this project was estimated at $8,500,000. The goal of the project was to deter crime within the existing park facility by improving the access to quality and safe recreational facilities for residents.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)NW 41St Street, from NW 79th Avenue to NW 87th Avenue – City of Doral; Doral, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION
<br />TBD
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Drainage Engineer responsible for designing and permitting the roadway drainage design associated with NW 41st Street, between NW 79
<br />Avenue to NW 87th Avenue. The scope of work included the widening of an existing two lane roadway (0.75 miles). Responsibilities included
<br />designing a fully on-site drainage system that consisted of drainage structures, storm sewers and french drains to dissipate the design storm.
<br />The project was designed to meet the requirements of Miami-Dade County Public Works Department (MDPWD), Miami-Dade County
<br />Department of Environmental Resources Management (DERM) and the South Florida Water Management District (SFWMD).
<br />d.
<br />(1) TITLE AND LOCATION (City and State)Palmer Park Site & Parking Lot Improvements, City of South Miami YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION
<br />2019
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm
<br />Project Manager and Engineer of Record for the design of Palmer Park’s improvements to its south & east parking lot. The project included the
<br />design of a site plan. drainage, paving and grading, striping and signage, etc. The drainage system included the design and use of filter socks, exfiltration trenches and a CDS hydrodynamic separator to alleviate flooding due to onsite and offsite flows.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)Dixie Corridor Septic to Sewer Lift Stations – City of Hollywood, Hollywood, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION
<br />2015
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Manager and Senior Civil Engineer responsible for the design, permitting and construction administration services for four sewer lift
<br />stations in the City of Hollywood (W-08, W-09, W-10 and E-22). One of the lift stations was a complete replacement design for an existing
<br />station and the other two were new lift stations that are being added to their network. The project has an estimated construction cost of
<br />approximately $1.3 Million. The goal of the project was to allow residential and commercial properties to disconnect from their septic tanks and connect to sewer treatment systems thereby reducing environmental impacts.
<br />P-43
|