Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME:Evelyn Rodriguez, P.E., ENV SP <br />13. ROLE IN THIS CONTRACT:Civil Engineering Design 14. YEARS EXPERIENCE <br />a.TOTAL:9 b.WITH CURRENT FIRM:9 <br />15. FIRM NAME AND LOCATION (City and State):EAC Consulting, Inc. – 5959 Blue Lagoon Suite 410, Miami Fl 33126 <br />16. EDUCATION (Degree and Specialization): <br />2013 MS in Engineering Management – Florida International University <br />2010 BS in Civil Engineering – Florida International University <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 78548 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):Envision Sustainability Professional <br />Member - American Society of Civil Engineers (ASCE) ASCE Miami Dade Branch Young Engineer of the Year 2017-2018 <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State)Rehabilitation of Parking Lot No.7, 20 and 30, Coral Gables, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION <br />N/A <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Engineer of Record responsible for implementing improvements to the existing lots to alleviate concerns relating to deficient conditions including <br />storm water ponding issues, ADA compliance, parking lot grading corrections, inadequate lighting levels, pavement irregularities, aesthetic <br />landscaping upgrades and other visual defects. Furthermore, the City intends to enhance its parking lots by incorporating elements of <br />sustainability and “green” environmentally friendly features that are consistent with the City’s initiatives. <br />b. <br />(1)TITLE AND LOCATION (City and State)Greynolds Park Rehabilitation and Improvements, Miami Gardens, Fl YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION <br />2019 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record for the site investigation, review of permitting agency requirements, schematic design and preliminary opinion of probable <br />cost and construction documents, permitting and limited construction administration. This project included the preliminary evaluation and design <br />of park the improvements such as parking lot renovations, access roadway re-alignment, existing culvert assessment and maintenance and new <br />sidewalks. The project also included the regrading of the maintenance facility yard. <br />c. <br />(1)TITLE AND LOCATION (City and State)SW 64th Avenue (Twin Lakes Drive) Drainage Improvement, South Miami, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION <br />2017 <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record responsible for design of a new storm water collection and disposal system, including a newly design exfiltration trench <br />drainage system to ameliorate the ponding being experienced by some of the residents along Twin Lake Drive. The project included 136 linear <br />feet of French Drain with a safety of factor of 2, 6-proposed Type D3 inlets and 3 drainage manholes. The regrading of the swales within the <br />drainage basin was paramount in making the proposed drainage system work efficiently. <br />d. <br />(1)TITLE AND LOCATION (City and State)NW 96th Street Roadway and Drainage Improvements, Town of Medley, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION <br />N/A <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm <br />Engineer of Record for providing professional engineering design services for the preparation of construction documents for drainage <br />improvements along NW 96th Street from SW River Drive to NW 87th Avenue. The scope of work included design of drainage system to collect <br />and discharge into the C6 Canal, design, redefining cross slopes to facilitate drainage, design of complete streets concept (to improve <br />pedestrian and bicycle traffic), pavement markings, permitting and opinion of cost. <br />e. <br />(1)TITLE AND LOCATION (City and State)I-75 Alligator Alley Environmental Education Project- Broward County, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION <br />TBD <br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Engineer of Record for providing professional engineering design services for the improvement of the existing I-75/Alligator Alley rest area by <br />constructing educational amenities which will require significant site work to reconfigure existing parking lots, access roads, drainage structures, <br />utilities, lighting and sidewalks. Proposed educational amenities will include observation tower, board walks, walkways, constructed wetlands <br />exhibits, asphalt trails, pavilions, hardscape (i.e. benches, trash receptacles, drinking fountains) and landscape. <br />P-42