E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME:Evelyn Rodriguez, P.E., ENV SP
<br />13. ROLE IN THIS CONTRACT:Civil Engineering Design 14. YEARS EXPERIENCE
<br />a.TOTAL:9 b.WITH CURRENT FIRM:9
<br />15. FIRM NAME AND LOCATION (City and State):EAC Consulting, Inc. – 5959 Blue Lagoon Suite 410, Miami Fl 33126
<br />16. EDUCATION (Degree and Specialization):
<br />2013 MS in Engineering Management – Florida International University
<br />2010 BS in Civil Engineering – Florida International University
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 78548
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):Envision Sustainability Professional
<br />Member - American Society of Civil Engineers (ASCE) ASCE Miami Dade Branch Young Engineer of the Year 2017-2018
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)Rehabilitation of Parking Lot No.7, 20 and 30, Coral Gables, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Engineer of Record responsible for implementing improvements to the existing lots to alleviate concerns relating to deficient conditions including
<br />storm water ponding issues, ADA compliance, parking lot grading corrections, inadequate lighting levels, pavement irregularities, aesthetic
<br />landscaping upgrades and other visual defects. Furthermore, the City intends to enhance its parking lots by incorporating elements of
<br />sustainability and “green” environmentally friendly features that are consistent with the City’s initiatives.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)Greynolds Park Rehabilitation and Improvements, Miami Gardens, Fl YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION
<br />2019
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record for the site investigation, review of permitting agency requirements, schematic design and preliminary opinion of probable
<br />cost and construction documents, permitting and limited construction administration. This project included the preliminary evaluation and design
<br />of park the improvements such as parking lot renovations, access roadway re-alignment, existing culvert assessment and maintenance and new
<br />sidewalks. The project also included the regrading of the maintenance facility yard.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)SW 64th Avenue (Twin Lakes Drive) Drainage Improvement, South Miami, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION
<br />2017
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record responsible for design of a new storm water collection and disposal system, including a newly design exfiltration trench
<br />drainage system to ameliorate the ponding being experienced by some of the residents along Twin Lake Drive. The project included 136 linear
<br />feet of French Drain with a safety of factor of 2, 6-proposed Type D3 inlets and 3 drainage manholes. The regrading of the swales within the
<br />drainage basin was paramount in making the proposed drainage system work efficiently.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)NW 96th Street Roadway and Drainage Improvements, Town of Medley, FL YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm
<br />Engineer of Record for providing professional engineering design services for the preparation of construction documents for drainage
<br />improvements along NW 96th Street from SW River Drive to NW 87th Avenue. The scope of work included design of drainage system to collect
<br />and discharge into the C6 Canal, design, redefining cross slopes to facilitate drainage, design of complete streets concept (to improve
<br />pedestrian and bicycle traffic), pavement markings, permitting and opinion of cost.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)I-75 Alligator Alley Environmental Education Project- Broward County, FL
<br />YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION
<br />TBD
<br />(3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Engineer of Record for providing professional engineering design services for the improvement of the existing I-75/Alligator Alley rest area by
<br />constructing educational amenities which will require significant site work to reconfigure existing parking lots, access roads, drainage structures,
<br />utilities, lighting and sidewalks. Proposed educational amenities will include observation tower, board walks, walkways, constructed wetlands
<br />exhibits, asphalt trails, pavilions, hardscape (i.e. benches, trash receptacles, drinking fountains) and landscape.
<br />P-42
|