Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Barry R. Miller, ASLA Principal in Charge a. TOTAL b. WITH CURRENT FIRM <br />34 26 <br />15. FIRM NAME AND LOCATION (City and State) <br />Savino & Miller Design Studio, P.A., North Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />University of Florida ( Master Of Urban and Regional Planning) <br />University of Florida (Bachelor in Landscape Architecture) <br />Registered Landsape Architect: Florida #866 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />ASLA and ULI Member <br />12 FLASLA Awards, among other awards <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami Baywalk & Riverwalk Design Guidelines <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017-2019 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Design Guidelines and Brand Development for the Miami Baywalk and Riverwalk in Greater Downtown Miami <br />Principal - Landscape Architect <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami Beach Multi-Purpose Facility, 17 to 18 ST & Meridian AV <br />Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2010 2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Located adjacent to City Hall in the City of Miami Beach, scope included a Landscape and Streetscape Master plan linking new <br />garage, City Hall and existing office building, through a bamboo promenade, an plaza, with a water feature. Scope included <br />design of Paving, Planting, Water Feature, Lighting and urban furniture. From Schematic Design through Construction Phase <br />Services.(19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit. <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDAventura Optima Professional Building <br />Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2011 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Landscape Master Plan and two green roof terraces. This is one of 2 buildings in South Florida to obtain Leed Platinum. Scope <br />inluded Landscape plan, Hard-surface, Water Features, Outdoor lighting. From Schematic Design through Construction Phase <br />Services.(19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit.2015 Award of Excellence for Green Roof <br />by Green Roof for Healthy Cities (NYC) <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SLS (Ritz Plaza Hotel) <br />Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2012 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Landscape Master Plan that included an entry courtyard with swimming pool and pool deck design . Planting, lighting, irrigation. <br />From schematic Design thru Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Museum Park <br />Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2012 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Re-designed and valued engineered proposed Bay-walk and Entry promenade to keep integrity of original Concept. Scope <br />included Paving, Planting, Irrigation, Urban furniture and lighting. From Schematic Design through Construction Observation <br />Phase. (19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit.