Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Adriana Savino-Miller Principal - Master Planning a. TOTAL b. WITH CURRENT FIRM <br />30 26 <br />15. FIRM NAME AND LOCATION (City and State) <br />Savino & Miller Design Studio, P.A., North Miami, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />University of Pennsylvania, M. Arch + Urban Design Certificate <br />Universidad Central de Venezuela, Architecture <br />Registered Architect, Florida <br />AR#14444 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />AIA Member <br />12 FLASLA Awards, among others <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />City of Miami Beach Future Community Park <br />Miami Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016-present <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Landscape Master Plan for this future community park project in Miami Beach. Scope included Paving, Planting, Site furniture <br />and lighting. <br />Principal - Master Planning <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami Baywalk & Riverwalk Design Guidelines <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017-2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Design Guidelines and Brand Development for the Miami Baywalk and Riverwalk in Greater Downtown Miami <br />Principal - Urban Designer <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Matheson Plantation Village <br />Key Biscayne, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Master plan through the restoration of three historic cottages, a reminiscence of Key Biscayne when the Matheson Family <br />donated land to the County. The plan calls for a sustainable village that exemplifies cultivation, conservation and stewardship <br />of the land with activities that recall Key Biscayne’s past, including the zoo, first introduced by the Mathesons. <br />Associate <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Museum Park <br />Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Downtown Miami waterfront 20-acre park adjacent to two museums. $10M construction cost <br />Principal - Master Planning <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Tamiami Canal Tender House <br />Miami, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmSite analysis and presentation of multiple options for site design, including whether to remove or replace the historic swing <br />bridge, how many lanes for new bridge and relocation of tender house. Design of new tender house and bridge railing. <br /> <br />Design Architect and Urban Designer