Laserfiche WebLink
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Biscayne Point Neighborhood Infrastructure Improvement. - City of Miami <br />Beach, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2006 <br />CONSTRUCTION <br />2013 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator for this project that encompasses targeted potable water distribution and roadway/streetscape improvements. The project <br />requires the design of approximately 19,000 LF of pressurized DIP water mains from 8-inch to 16-inch and service connections to homes of <br />more than 500 residents in Miami Beach. The project involved the restoration and enhancement of streetscapes and infrastructure, consistent <br />with existing available master plans, qualified decisions of applicable City dept., and community preferences. It also included portable water <br />infrastructure, stormwater and restoration and enhancement of the neighborhood’s hardscape, streetscape, irrigation, and lighting. <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) Pine Island Road from Oakland Park Boulevard to Commercial Boulevard – Sunrise, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> 2008 <br />CONSTRUCTION <br />2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Administrator responsible for responding to RFI’s, change orders, pay requests and plan interpretation for this project involving the <br />reconstruction and widening of the existing 4-lane facility, to a 6-lane divided facility including bike lanes, sidewalk, 30-inch ductile iron (DIP) <br />water main, drainage system, street lighting, signalization, landscaping, irrigation system, signing and pavement markings. <br />c. <br />(1) TITLE AND LOCATION (City and State) NW 21st Avenue from NW 19th Street to Oakland Park Boulevard – Fort Lauderdale, FL <br />YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION <br />2011 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Senior Roadway Inspector / Project Administrator responsible for responding to RFI’s, Change Orders, Pay Requests plan interpretation, <br />field inspections for this project involving the reconstruction of the existing 3-lane facility, including bike lanes, sidewalk, 8-inch ductile <br />iron (DIP) water main, 6-inch force main, drainage system including jacked 72” RCP under the CSX R/R, asphalt paving, street lighting, <br />upgrading the signalization system, landscaping, irrigation system, signing and pavement markings. <br />d. <br />(1) TITLE AND LOCATION (City and State) Sunrise Boulevard from Hiatus Road to Pine Island Road - Plantation, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br /> CONSTRUCTION <br />2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm <br />Project Administrator responsible for responding to RFI’s and plan interpretation. Widening and overbuild of an existing 4-lane divided <br />facility to a 6-lane divided facility, including sidewalk, subsoil excavation, drainage, signalization, street lighting, landscaping, irrigation <br />and signing & pavement markings. <br />e. <br />(1) TITLE AND LOCATION (City and State) 145th Avenue / Pembroke Road – Miramar, FL YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2003 <br /> CONSTRUCTION <br />2005 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Administrator responsible for approving pay requests and shop drawings Mr. Labelle responds to RFIs and change orders, plan <br />interpretation and correspondence, and also oversee removal of unsuitable material. <br /> STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Jeffery LaBelle 13. ROLE IN THIS CONTRACT: CEI/Construction Administration/Construction Management Services <br />14. YEARS EXPERIENCE <br />a. TOTAL: 35 b. WITH CURRENT FIRM: 3 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): Nova High School, Davie, FL 1976 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):