Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Carlos Francis Senior Traffic Engineer a. TOTAL b. WITH CURRENT FIRM <br />27 4.5 <br />15. FIRM NAME AND LOCATION (City and State) <br />Choice Engineering Consultants (Miami, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />BS in Civil Engineering Professional Engineer No. 51364 (Florida) <br />Professional Traffic Operations Engineer (Florida) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Miscellaneous Studies & RCI Data <br />FM No: 249726-6-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing since 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Subconsultant responsible for providing traffic engineering services to produce traffic engineering studies (including traffi c data collection) <br />to support the Traffic Operations Office. Recent efforts include the production of Bottleneck Studies along SR 5/Biscayne Boulevard and <br />also along SR 826/NW 167 Street. Scope for these studies included field reviews, data collection, VISSIM simulation, develop ment of <br />recommendations and documentation in report format. <br />b. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations Studies <br />FM No.: 409521-6-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing since 2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Serving as the Project Manager responsible for the overall management and performance of traffic engineering services to prod uce <br />operational studies and other traffic engineering studies (including traffic data collection) to support the Traffic Operations Office and <br />address citizen complaints. <br />c. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations / Safety Studies <br />FM No.: 414052-2-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing since 2016 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Project Engineer providing traffic engineering services to produce safety studies, fatal crash review (both office and field based), RRR <br />safety reviews, Road Safety Audits, and traffic engineering studies (including traffic data collection) to support the Hazard Reduction <br />Program, the Safe Routes To School Program, and further the Strategic Highway Safety Plan. May represent the Traffic Operations Office <br />for the Rail Diagnostic field reviews and study development. <br /> <br />d. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations Plans & Permit Reviews <br />FM NO.: 415239-2-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Served as a sub-consultant Sr. Traffic Engineer providing plans review, permit reviews of both traffic impact studies and plans, traffic <br />report review, scoping report review from a traffic operations perspect ive. Also performed miscellaneous studies to address Citizens <br />complaints including an operational analysis to evaluate the need for a U -turn restriction at a signalized intersection. <br />e. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations / Safety Studies Consultant <br />(Broward) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2005 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Project Manager providing traffic engineering services to produce safety studies, plans review, and traffic engineering studi es to support <br />the Hazard Reduction Program. These study efforts included operational analysis using both the HCS and SYNCHRO software, traffic signal <br />timing/phasing plan development, cost estimating and benefit/cost analysis efforts. RRR Safety Reviews were performed at mult iple <br />locations. <br />