My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Eugenio Lopez Traffic Engineer a. TOTAL b. WITH CURRENT FIRM <br />17 4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Choice Engineering Consultants (Miami, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />MS in Civil Engineering Professional Engineer No. 68213 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />2019 Intersection Control Evaluation (ICE) Training for Analysts <br />2019 Intersection Control Evaluation (ICE) Training for Managers/Approvers <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations / Safety Studies <br />FM No.: 414052-2-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Ongoing since 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Project Manager providing traffic engineering services to produce safety studies, office based fatal crash review, field base d fatal crash <br />reviews, RRR safety reviews, Road Safety Audits, Signal Warrant Analysis, Qualitative Analysis reports, Technical Memorandums, and <br />overall traffic engineering studies (including traffic data collection) to support the Hazard Reduction Program, the Safe Rou tes To School <br />Program, and further the Strategic Highway Safety Plan. <br />b. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations Studies Consultant <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Transportation Engineer. Professional services for various traffic operation and safety studies, including Road Safety Audits at locations <br />throughout the District. The work addresses safety concerns identified through reviews of FDOT’s Crash Analysis Reporting System as <br />well as requests from citizens or elected officials. <br />c. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations Studies <br />FM No.: 409521-3-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2014 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Served as a sub-consultant Traffic Engineer providing traffic engineering and data collection services to produce operational studies, to <br />support the Traffic Operations Office Citizen Tracking Program . <br /> <br />d. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Traffic Operations / Safety Studies <br />FM No.: 249796-3-32-01 <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2014 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Traffic Engineer providing traffic engineering services to produce safety studies, plans review, and traffic engineering stud ies (including <br />traffic data collection) to support the Hazard Reduction Program and the Safe Routes to School Program. RRR Safety R eviews were <br />performed at multiple locations. Represented the Traffic Operations Office for the Rail Diagnostic field reviews and study de velopment. <br />e. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />NW 74th Street SIS/NHS Connector Traffic Study <br />(Miami-Dade) <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm <br />Traffic Engineer responsible for providing traffic engineering services in the preparation of a conceptual design analysis to identify <br />potential short- and long-term capacity, access, operational, and safety improvements in the vicinity of the NW 74 Street SIS/NHS <br />Connector to the FEC Hialeah Rail Yard that will benefit the movement of freight and goods. <br />
The URL can be used to link to this page
Your browser does not support the video tag.