|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Oracio Riccobono, P.E. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM
<br />31 12
<br />15. FIRM NAME AND LOCATION (City and State)
<br />GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Civil Engineer (BSCE, 1983), Master Degree (MSCE in Geotechnical
<br />Engineering, 1985) at Louisiana State University and Master in Business
<br />Administration (MBA, 2000) at Florida International University
<br />Registration No. 49324 (Florida, Civil Engineering)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers
<br />Florida Engineering Society
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe
<br />to Osceola Counties
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2012 – 2019 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of
<br />geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />City of Doral Tile District Drainage Study, Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer for the drainage study to identify improvements to reduce recurring flooding in a low-lying commercial area. Responsibilities
<br />included compilation of existing geotechnical exploration including soil and water sampling to screen for volatile organics, ammonia, metals, lead,
<br />aluminum, and iron; delineation of areal extent of undocumented landfill dumping activities and contamination; conceptual design of alternatives;
<br />responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design
<br />and construction recommendations.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />City of Doral Basin H-8 Drainage Improvements Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer Responsibilities included geotechnical exploration, and identification of utility conflicts as well as planning the geotechnical exploration and
<br />laboratory testing programs, preparation of the geotechnical engineering report for exfiltration trench design.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6.
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 - 2013 2011 - 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with
<br />foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />J.C. Bermudez Park Recycled Stormwater Irrigation Project. Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with
<br />foundation design and construction recommendations for design of irrigation system for the 80-acre park. Major components included emergency lake intake structure, 2 MG
<br />above ground storage tank, 3,000 gpm storm water pump station, 130 micron disk filters with automatic backwash, bleach disinfection system, 1,400 gpm irrigation pumps,
<br />8,000 feet of 12-inch diameter looped main, and irrigation system. STANDARD FORM 330 (6/2004) PAGE 2
|