Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Oracio Riccobono, P.E. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM <br />31 12 <br />15. FIRM NAME AND LOCATION (City and State) <br />GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Civil Engineer (BSCE, 1983), Master Degree (MSCE in Geotechnical <br />Engineering, 1985) at Louisiana State University and Master in Business <br />Administration (MBA, 2000) at Florida International University <br />Registration No. 49324 (Florida, Civil Engineering) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers <br />Florida Engineering Society <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe <br />to Osceola Counties <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 – 2019 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of <br />geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Doral Tile District Drainage Study, Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Geotechnical Engineer for the drainage study to identify improvements to reduce recurring flooding in a low-lying commercial area. Responsibilities <br />included compilation of existing geotechnical exploration including soil and water sampling to screen for volatile organics, ammonia, metals, lead, <br />aluminum, and iron; delineation of areal extent of undocumented landfill dumping activities and contamination; conceptual design of alternatives; <br />responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design <br />and construction recommendations. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />City of Doral Basin H-8 Drainage Improvements Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Geotechnical Engineer Responsibilities included geotechnical exploration, and identification of utility conflicts as well as planning the geotechnical exploration and <br />laboratory testing programs, preparation of the geotechnical engineering report for exfiltration trench design. <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6. <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 - 2013 2011 - 2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with <br />foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000 <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />J.C. Bermudez Park Recycled Stormwater Irrigation Project. Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2010 2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with <br />foundation design and construction recommendations for design of irrigation system for the 80-acre park. Major components included emergency lake intake structure, 2 MG <br />above ground storage tank, 3,000 gpm storm water pump station, 130 micron disk filters with automatic backwash, bleach disinfection system, 1,400 gpm irrigation pumps, <br />8,000 feet of 12-inch diameter looped main, and irrigation system. STANDARD FORM 330 (6/2004) PAGE 2