|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Adnan Ismail, P.E. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM
<br />13 13
<br />15. FIRM NAME AND LOCATION (City and State)
<br />GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />M.S., Civil Engineering, (Geotechnical), Florida International Univ., 2012
<br />B.S., Civil Engineering, Florida International University, 2006
<br />
<br />Registration No. 76014 (Florida, Civil Engineering)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Civil Engineers
<br />Florida Engineering Society
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe
<br />to Osceola Counties
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2012 – 2019 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of
<br />geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hard Rock Stadium Pedestrian Bridges
<br />Bridge #1 Over NW 199th St. & Bridge #2 Over Turnpike Access Rd.,
<br />City of Miami Gardens, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering
<br />report with foundation design and construction recommendations, foundation inspections, and foundation certifications.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Pedestrian Bridge over US-1
<br />Isla Morada, Monroe County, FL (FM: 442040-1)
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 N/A (Scheduled for 2020)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering
<br />report with foundation design and construction recommendations.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6.
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 - 2013 2011 - 2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with
<br />foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />West Avenue Pedestrian Bridge and Lincoln Court Pedestrian Bridge Over the Collins Canal City of Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with
<br />foundation design and construction recommendations, foundation inspections, and foundation certifications.
<br />STANDARD FORM 330 (6/2004) PAGE 2
|