Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME Vincent McNish, P.E., LEED AP, CxA <br /> 13. ROLE IN THIS CONTRACT Senior Mechanical Engineer 14. YEARS EXPERIENCE <br />a. TOTAL 27 <br />b. WITH CURRENT FIRM 19 <br /> 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida <br /> 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Mechanical Engineering <br />Master of Science in Mechanical Engineering <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> Florida, Mechanical P.E. #53287 <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. McNish has over twenty-six years of experience in all phases of mechanical engineering analysis and design for <br />HVAC systems for all building types including educational, commercial and industrial facilities. Plumbing experience <br />involves commercial and residential building configurations, systems design and code compliance studies. Fire <br />Protection designs include wet, dry and pre-action systems experience. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of Sunny Isles Beach Pelican Community Center <br />Sunny Isles, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (if applicable) <br />2008 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New two-story, 13,000 square foot community center building and a basketball/gymnasium building of approximately <br />9,900 square feet. The community center building is to include some offices, several multi-purpose spaces, a <br />warming kitchen and a pantry for the use of caterers. The Gymnasium is to include a full-size basketball court and a <br />snack bar area. $7.4 million / 23,000 sf Project Role: Senior Mechanical Engineer <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miramar Police Headquarters, <br />Miramar, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (if applicable) <br />2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story <br />structure will provide retail space at the ground floor and police department on the second and third floors. Provided <br />security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold. Project Role: Senior <br />Mechanical Engineer <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Royal Caribbean Cruise Lines Ltd. Innovation Lab, <br />Miami, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (if applicable) <br />2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed <br />designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story <br />virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on <br />the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square <br />foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just <br />10 months. Energy modeling estimated saving energy costs by 23.5% compared to ASHRAE 90.1-2007. 2016, AIA <br />Palm Beach, Unbuilt Award of Merit, Non-Residential. LEED 2009 Silver Certified. $20 million / 20,000 sf. Project <br />Role: Senior Mechanical Engineer <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Springs Aquatic Facility, <br />Miami Springs, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession <br />space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and <br />site lighting. $5 million / 8,600 sf. Project Role: Senior Mechanical Engineer <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Beach Parking Lots, <br />Miami Beach, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2015 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical Lighting design for three parking lots (12X, 17X and 4D) along with the necessary foot candle calculations, <br />photometrics and circuiting. The project also includes an irrigation system design to complement the landscaping <br />design/$200,000/2015/TLC Prime. Project Role: Senior Mechanical Engineer <br />