Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME Ralph Baeza, PE, MBA, MA., LEED AP <br /> 13. ROLE IN THIS CONTRACT Senior Electrical Engineer 14. YEARS EXPERIENCE <br />a. TOTAL 37 <br />b. WITH CURRENT FIRM 12 <br /> 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida <br /> 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Electrical Engineering/MBA/ Universidad Nacional <br />Autónoma de Honduras/M.A., Trinity International University <br />Business Administration Organizational Leadership <br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> Florida, P.E. #42641 <br /> <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Baeza is a registered professional engineer with over thirty years of experience, in all aspects of electrical engineering, project <br />management and design in the building construction industry. Mr. Baeza background with engineering systems encompasses high, <br />medium and low voltage power, normal and emergency power, lighting, fire alarm, telephone, television, public address, security, lighting <br />protection, environmental control and building management for residential, commercial, institutional and industrial buildings. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miramar Police Headquarters Building <br />Miramar, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (if applicable) <br />2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure <br />will provide retail space at the ground floor and police department on the second and third floors. Provided security design <br />for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold.Project Role: Senior Electrical Engineer <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Beach Bus Stop Shelters <br />Miami Beach, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2019 <br />CONSTRUCTION (if applicable) <br />2019 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prototype of a site adaptable bus shelter system (or module) for 197 sites. Project Role: Senior Electrical Engineer <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Royal Caribbean Cruise Lines Ltd. Innovation Lab, <br />Miami, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (if applicable) <br />2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed <br />designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual <br />reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second <br />floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation <br />as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. Energy <br />modeling estimated saving energy costs by 23.5% compared to ASHRAE 90.1-2007. 2016, AIA Palm Beach, Unbuilt <br />Award of Merit, Non-Residential. LEED 2009 Silver Certified. $20 million / 20,000 sf. $20 million / 20,000 sf. Project Role: <br />Senior Electrical Engineer <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Springs Aquatic Facility, <br />Miami Springs, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (if applicable) <br />2015 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, <br />1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. <br />$5 million / 8,600 sf. Project Role: Senior Electrical Engineer <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Florida International University Sports Practice Fields <br />Miami, Florida <br /> (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project is to consist of the design for approximately 6,500 sf of additions and 34,000 sf of alterations to the existing <br />clubhouse, approximately 40,500 GSF overall, located in Boynton Beach, Fl. $4 million / 40,500 sf. Project Role: Senior <br />Electrical Engineer