|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br /> 12. NAME Manuel A. Mollinedo, PE, LEED Green
<br />Associate
<br /> 13. ROLE IN THIS CONTRACT Design Engineer | Electrical 14. YEARS EXPERIENCE
<br />a. TOTAL 14
<br />b. WITH CURRENT FIRM 6
<br /> 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida
<br /> 16. EDUCATION (DEGREE AND SPECIALIZATION) Universidad Central de Las Villas, Cuba B.S., Electrical Engineering
<br />VEB Nachricht Electronic Engineering, Germany M.S., Microwave Link
<br />Communications
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br /> Florida, Electrical P.E. #63096
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Manuel is a registered professional engineer in Florida and Virginia with more than 10 years of experience. He has
<br />experience in all aspects of electrical engineering including high, medium and low voltage power, normal and emergency
<br />power, lighting, fire alarm, telephone, television, public address, security, lighting protection, environmental control and
<br />building management for residential, commercial, institutional and industrial buildings. He has strong experience in project
<br />management and coordination with multiple disciplines. His project experience includes educational facilities, institutional
<br />projects and office space.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Broward College Parking Lot Lighting
<br />Davie, Florida
<br /> (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) 2014
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Development of electrical engineering design drawings for the lighting audit and assessment of 14 parking lots at
<br />Broward College. Additional services updates include parking lots J, L and M and associated entrance to campus
<br />Project Role: Electrical Design Engineer
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miramar Police Department Headquarters
<br />Miramar, Florida
<br /> (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story
<br />structure will provide retail space at the ground floor and police department on the second and third floors. Provided
<br />security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold. Role: Electrical Design Engineer
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Royal Caribbean Cruise Lines Ltd. Innovation Lab,
<br />Miami, Florida
<br /> (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (if applicable)
<br />2017
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed
<br />designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual
<br />reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the
<br />second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot
<br />renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10
<br />months. LEED 2009 Silver Certified. $20 million / 20,000 sf. Project Role: Electrical Design Engineer
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miami Springs Aquatic Facility,
<br />Miami Springs, Florida
<br /> (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) 2015
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space,
<br />1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site
<br />lighting. $5 million / 8,600 sf. Project Role: Electrical Design Engineer
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miami Beach Bus Stop Shelters
<br />Miami Beach, Florida
<br /> (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (if applicable)
<br />2018
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prototype of a site adaptable bus shelter system (or module) for 197 sites
<br />Project Role: Electrical Design Engineer
|