My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER (1) <br />21. TITLE AND LOCATION (City and State) <br />Hard Rock Stadium Pedestrian Bridges Design <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNERCity of Miami Gardens b. POINT OF CONTACT NAMELes Pettit c. POINT OF CONTACT TELEPHONE NUMBER305-622-8000 <br />24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) <br />EAC as a Sub to Bentley has just completed the design of two pedestrian bridges to facilitate pedestrian access to and from the Hard Rock <br />Stadium which can hold up to 60,000 spectators. One of the proposed bridges, with a span length of 151’-11” and a width of 14’-0”, will be over <br />NW 199th Street on the south side of the stadium and the other, with a span length of 206’-11”and a width of 14’-0”, will be over the Turnpike <br />Access Road on the east side. The superstructure for both bridges was designed by Contech Engineered Solutions LLC and will be a variable <br />depth walk-thru steel truss with a cast-in-place concrete deck. The bridges approach ramps will have pedestrian walkways supported by wrap- <br />around MSE walls, as well as stairs at the ramp entrances to facilitate pedestrian access during sports events. <br />Construction on this fast track Design-Build project has already started in mid-January 2019 <br />and is scheduled for completion by the end of September 2019 – just in time for the onset of the NFL regular season and five months before <br />the stadium hosts Super Bowl LIV. <br />EAC provided design services for the two pedestrian bridges substructures and for the MSE wall control drawings for the ramps at both bridge <br />approaches. With a very aggressive schedule on this job, EAC was able to meet all of the design submittals deadlines. EAC is currently <br />providing Post-Design services for the bridges and MSE walls related items. <br />25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br />a. (1)FIRM NAME <br />EAC Consulting, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Prime <br />b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />c. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 - EAC Consulting, Inc. Page 3
The URL can be used to link to this page
Your browser does not support the video tag.