My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
EAC Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:25:43 PM
Creation date
1/14/2020 3:23:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER (4) <br /> <br />21. TITLE AND LOCATION (City and State) Downtown Government Center Station (All Aboard Florida) 22. YEAR COMPLETED <br />PROFESSIONAL <br />SERVICES <br />CONSTRUCTION (If applicable) <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER CGC/Brightline b. POINT OF CONTACT NAME Robert Cortes c. POINT OF CONTACT TELEPHONE NUMBER 305-520-2470 <br />24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />EAC provided structural design services for the Miami Central Station Rail Infrastructure and Rail Viaduct, and also provided post-design <br />support. The viaduct is an elevated guideway structure, built 50 feet above ground for AAF and Tri-Rail passenger trains. EAC collaborated <br />with New York City architectural firm Skidmore, Owings, & Merrill (SOM) on the design of one of the viaduct’s most prominent features, the <br />distinctive V-shaped columns which enhance the aesthetics and open layout of the station’s entrance. In order to maintain the station’s high- <br />quality environment, EAC’s design also employs context-sensitive vibration impact mitigation, which would prevent train vibration from <br />spreading into the station area. As an integrated component of the Miami Central Station, the design of the viaduct is an example of the <br />sensitive balance of aesthetic form and function. <br /> <br />Total Construction: $1.5 Billion <br /> <br />25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br /> <br />a. <br /> <br />(1) FIRM NAME <br />EAC Consulting, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br /> <br />(3) ROLE <br />Prime <br /> <br />b. <br /> <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 - EAC Consulting, Inc. Page 3
The URL can be used to link to this page
Your browser does not support the video tag.