Laserfiche WebLink
STANDARD FORM 330 (REV. 3/2013) PAGE 2 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete on Section E for each key person) <br />12. NAME <br />Andrew Barthle, PE <br />13. ROLE IN THIS CONTRACT <br />Electrical / Lighting Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />15 b. WITH CURRENT FIRM <br />14 <br />15. FIRM NAME AND LOCATION (City and State) <br />HARDESTY & HANOVER (Sunrise, FL) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. / Electrical Engineering / Rensselaer Polytechnic Institute <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Professional Engineer: FL <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Andrew Barthle is a Senior Associate and Electrical Engineer at Hardesty & Hanover. With over 14 years of professional experience, <br />Andrew is responsible for inspection, planning, design, and providing construction support for electrical systems including power <br />distribution, lighting, PLC and relay control, motion control, CCTV, and cathodic protection systems for transportation facilities such as <br />roadways, movable bridges, control houses, and other structures. <br />19. RELEVANT PROJECTS <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />NOB HILL ROAD LIGHTING FROM HILLSBORO BOULEVARD TO <br />LOXACHATTEE ROAD <br />Parkland, FL <br />Electrical Engineer. Responsible for providing lighting analysis and engineering design for construction plans for a roadway lighting <br />system (standard FPL cobra-head type concrete light pole system) to be placed along Nob Hill Road. Also provided quantities and <br />estimates for this new installation. <br />ENGINEERING COMPLETED <br />2016 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />FLAGLER MEMORIAL BRIDGE over ICWW <br />Palm Beach, FL <br />Electrical Engineer. Responsible for design, calculations, plan preparation, and post design of the bridge electrical systems. Work <br />included design of interior lighting, architectural accent lighting, CCTV, a relay-based control system with PLC-based condition <br />monitoring of machinery, a two-generator emergency power system, and flux vector motor drives as part of a $95 million design-build <br />project that included replacement of the entire bridge off-line and parallel to the existing bridge to maintain traffic for this busy <br />causeway connecting West Palm Beach to Palm Beach. The replacement bridge, completed in 2018, is a twin double-leaf rolling lift <br />bascule span bridge with a 150-foot rolling-lift-span over the navigable channel; twelve 150-foot pre-stressed concrete approach <br />spans; and approach roadway work. <br />ENGINEERING COMPLETED <br />2016 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />SR 968 / SW 1ST STREET BRIDGE at MIAMI RIVER <br />Miami, FL <br />Electrical Engineer and Engineer of Record. Responsible for design, calculations and plan preparation for the bridge electrical systems <br />including exterior accent and interior utility lighting, a new relay-based control system with PLC monitoring, service upgrade, <br />emergency generation, flux vector drives, and CCTV for the replacement of a NRHP eligible bascule bridge over the Miami River <br />located adjacent to a NRHP listed and local historic district. The existing bridge is a 650.5-foot, 13-span bridge constructed in 1929 <br />and is the gateway crossing into downtown Miami. The new 507-foot bridge will include a 325-foot double-leaf bascule span over a <br />widened 150-foot navigation channel. Two new approach spans will consist of prestressed concrete beams providing 18 feet of <br />clearance over North and South River Drives. <br />ENGINEERING COMPLETED <br />Post Design <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />LOXAHATCHEE ROAD LIGHTING FROM BISHOP PIT ROAD TO SR 7 <br />Parkland, FL <br />Electrical Engineer Responsible for providing lighting analysis and engineering design for construction plans for a roadway lighting <br />system (standard FPL cobra-head type concrete light pole system) to be placed along Nob Hill Road. Also provided quantities and <br />estimates for this new installation. <br />ENGINEERING COMPLETED <br />2019 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />TITLE AND LOCATION (City/State); BRIEF DESCRIPTION (scope, size, cost, etc.); ROLE <br />JUPITER FEDERAL BRIDGE over the LOXAHATCHEE RIVER <br />Jupiter, FL <br />Lead Electrical Engineer. Responsible for providing electrical engineering and design services during the preliminary, final, and post- <br />design phases of this bascule bridge replacement project which includes Interior lighting (machinery areas, control room, etc.), <br />architectural accent lighting, lighting for the observation deck beneath the bridge, a new relay-based control system with PLC <br />monitoring, electric service upgrade, emergency power Ageneration, flux vector drives, and CCTV. H&H will serve as Engineer of <br />Record for the project which addresses the structural and functional deficiencies and includes the development of vertical and horizontal <br />alignment for bridge replacement alternatives and study of the resulting impacts. The project will include ADA access ramps to the 8- <br />foot sidewalks and a new 7-foot buffered bike lane for additional safety <br />ENGINEERING COMPLETED <br />2021 <br />CONSTRUCTION COMPLETED <br />n/a <br /> Check if project performed with current firm <br />