<br />STANDARD FORM 330 (REV. 8/2016) PAGE 3
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS
<br />CONTRACT 14. YEARS EXPERIENCE
<br />Lisandra Fuentes
<br />
<br />Utility Coordinator
<br /> a. TOTAL
<br />3
<br /> b. WITH CURRENT FIRM
<br />2
<br />15. FIRM NAME AND LOCATION (City and State)
<br />F.R. Aleman & Associates, Inc. (Doral, Florida)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Master of Science, Civil Engineering
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D4, SR 5/US 1 from SR 834/Sample Road to Broward/Palm Beach County Line, Utility
<br />Coordinator (Fort Lauderdale, FL)
<br /> PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />On this project, Lisandra provided utility coordination services for the construction of bicycle lanes, roadway widening, new curb and gutter, sidewalk upgrades,
<br />drainage, and signing and pavement marking. She coordinated with the design team and the 14 UAOs that were present within the project boundaries. Once identified,
<br />she involved all UAOs early in the design process; sent contact letters; retrieved utility facility information; assisted the SUE effort with vertical and horizontal locate
<br />requests; performed and coordinated constructability review; identified conflicts with existing utility facilities and the proposed improvements; scheduled a kick-off
<br />meeting with District 4; scheduled and lad utility design meetings to discuss potential utility conflicts with UAOs and all d esign disciplines; performed field reviews as
<br />needed; assisted with any Utility Work by Highway Contractor Agreements requests; acquired Utility Work Schedules or No Conflict/No Facilities responses from all
<br />UAOs; and prepared Utilities Certification Packages.
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D4, Lyons Road from C-14 Canal to Sawgrass Expressway – Bike Lane/Sidewalk, Utility
<br />Coordinator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The overall purpose of this TWO was to improve mobility on Lyons Road by providing bicycle lanes. Lisandra provided utility c oordination services for roadway
<br />widening, sidewalk upgrades, crosswalk upgrades, lighting, drainage, and signing and pavement marking. She coordinated with t he design team and the 16 utility
<br />agency owners (UAOs) that were present within the project boundaries. Once identified, sh e involved the UAOs early in the design process; sent contact letters;
<br />retrieved utility facility information; assisted the SUE effort with vertical and horizontal locate requests; performed and c oordinated constructability reviews; identified
<br />conflicts with existing utility facilities and the proposed improvements; scheduled a kick-off meeting with District 4; scheduled and led utility design meetings to discuss
<br />potential utility conflicts with UAOs and all design disciplines; performed field reviews, as n eeded; assisted with any Utility Work by Highway Contractor Agreements
<br />requests; acquired Utility Work Schedules or No Conflict/No Facilities responses from all UAOs; and prepared Utilities Certif ication Packages.
<br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D4, SR 809/Military Trail at Forest Hill Boulevard Intersection Improvement, Utility
<br />Coordinator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />On this project, Lisandra provided utility coordination services for roadway widening, drainage, signalization, lighting, bus stops, sidewalk, address ADA deficiencies,
<br />and signing and pavement marking. She coordinated with the nine UAOs that were present within the project limits and was able to help minimize the expenses
<br />incurred by these agencies by involving them early in the design process. Lisandra sent contact letters, retrieved utility facility information, and scheduled a kick-off
<br />meeting with District 4.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />
<br />FDOT D4, Video Camera Detection - Multiple Locations Traffic Control Devices/System, Utility
<br />Coordinator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />On this project, Lisandra provided utility coordination production support for video camera detection at multiple locations within Palm Beach County. She identified
<br />and coordinated with the 28 UAOs that were present within the project limits early in the design process; sent contact letters; retrieved utility facility information; and
<br />scheduled a kick-off meeting with District 4.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D6, SR A1A/S Roosevelt from Bertha Street to the end of Smathers Beach, Utility
<br />Coordinator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />Ongoing N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />On this project, Lisandra provided utility coordination services in compliance with contract standards. She identified and coordinated with the UAOs within the project
<br />limits early in the design process; sent contact letters; and retrieved utility facility information.
|