<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS
<br />CONTRACT 14. YEARS EXPERIENCE
<br />Osvaldo Sanchez
<br />
<br />Sr. Utility Coordinator
<br /> a. TOTAL
<br />29
<br /> b. WITH CURRENT FIRM
<br />1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />F.R. Aleman & Associates, Inc. (Doral, Florida)
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science, Electrical Engineering
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D4, I-595 Roadway Improvements Projects - Power Service Design, Utility Coordinator
<br />(Fort Lauderdale, FL)
<br /> PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2011 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />This project involved FRA locating and documenting reliable power sources that were a critical part of the overall I-595 project. Electrical design included providing
<br />detailed power service locations within the project limits for Reversible Express Lanes Access Control subsystem, a CCTV came ra subsystem, a DMS subsystem,
<br />changeable message sign (CMS) subsystem, a HAR subsystem, a microwave vehicle det ection station (MVDS) subsystem and three communication hubs. The
<br />electrical design services also included the toll building and toll gantry electrical systems. Mr. Sanchez coordinated all se rvice points with FPL representatives,
<br />coordinated all changes in location due to relocation by FPL, and provided utility coordination for power service points required. To enhance power reli ability, FRA
<br />designed a power distribution and backup system consisting of underground electrical conductor circuits to all ITS de vices, transformers, generators, automatic transfer
<br />switches, and UPS included as part of the scope of work. Mr. Sanchez coordinated all locations for the back-up power equipment, provided all utility coordination for
<br />back-up equipment sites, and assisted FRA designers with back-up equipment power requirements.
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D4, I-595 Roadway Improvements Projects - Maintenance of Broward County Fiber Optic
<br />Cable), Utility Coordinator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2011 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The primary objective of this task was to provide construction plans for maintenance of the existing Broward County ITS fiber optic cable during const ruction of the I-
<br />595 Improvement Project from University Drive to I-95. A majority of the existing Broward County ITS fiber optic cable would have been affected by the proposed
<br />construction FRA developed ITS plans that allowed for construction of the main permanent conduit trunk-line, temporary cross-over conduit, and temporary splice
<br />vaults as part of the MOT Phase I construction of Zones 6 and 7 from University Drive to east of SR 7. Mr. Sanchez provided utility coordination through extensive
<br />field investigation and assisted in the development of BFO Relocation Plans. ITS plans were developed to incorporate all cons truction phasing until the permanent
<br />ITS fiber optic network was completed.
<br />c (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FDOT D4, Districtwide Utility Negotiations Consultant, Utility Coordinator PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2007 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The FRA team of Utility Coordinators served the District on four roadway contracts. These assignments required Mr. Sanchez to work with various utilities on different
<br />projects from Broward to Brevard County. He also reviewed plans for the District using information collected during field vis its and meetings with pertinent utilities. The
<br />goal was to ensure all potential conflicts were located/resolved and the final plans reflected the identified information properly, before the start of construction
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />
<br />FDOT D6, Assistant District Utility Administrator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2018 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ozzie worked directly under the District Utility Administrator. His responsibilities included resolving all in-house requests and issues, processing JPA’s, encumbering
<br />funds for upcoming projects, as well as coordinating numerous FDOT roadway projects. He also did QA/QC on clear packages and assisted in the training of in-
<br />house consultants.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida’s Turnpike Enterprise, SunNav ITS Phase IV, Segment II (MP 227 to 309), SunNav ITS
<br />Phase IV, Segment I (MP 155 to 227), SunNav ITS Phase III (SR 869 from MP 0 to 8 and MP 21.2
<br />to 22), Utility Coordinator
<br />PROFESSIONAL
<br />SERVICES
<br />CONSTRUCTION (If applicable)
<br />2006 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ozzie provided utility coordination on these five ITS design-build SunNav projects. These projects required coordination with 52 utility agencies to avoid conflicts
<br />during construction and to locate suitable electric service points from the various electric utilities to power the cameras.