Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Brian Shore, RLA <br />13.ROLE IN THIS CONTRACT <br />Senior Landscape Architect - <br />Landscape / Hardscape / Irrigation <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />19 <br />b.WITH CURRENT FIRM <br />19 <br />15.FIRM NAME AND LOCATION (City and State) <br />Miller Legg, Ft. Lauderdale, FL <br />16.EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Science, Landscape Architecture 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)FL, Registered Landscape Architect <br />FL, FDOT Intermediate Maintenance of Traffic <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />As a Senior Landscape Architect, Mr. Shore has significant experience in landscape architectural design and landscape construction s ervices for a variety of public and private projects. Specialties include landscape, <br />hardscape, and irrigation design services for streetscape and roadway projects including the Florida Department of Transportation (FDOT), all aspects of active and passive park design, health-care campuses, andenvironmental wetland habitat creation. Other experience includes various residential and c ommercial projects. <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />City of Sunny Isles Beach Pelican Community Park <br />Sunny Isles Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2008 <br />CONSTRUCTION (If <br />Applicable) <br />2008 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Landscape Designer: A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, <br />recreation building, playground structure, gymnasium, related site amenities and secured a Florida Recreational Development A ssistance Program (FRDAP) grant for $200,000. The Miller <br />Legg Team received recognition from the City for their involvement in the design completion. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Florida Department of Transportation (FDOT) District 6 Brickell <br />Avenue Roadway and Pedestrian Enhancements <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager: As part of a safety improvement project, Miller Legg assisted A&P Transportation Engineering to produce landscape and hardsca pe improvement plans for a 3-block area <br />within the urban roadways of Downtown Miami including pedestrian enhancements such as wider sidewalks and crosswalk improvements. This project was completed under a multi-year <br />Districtwide Misc. PE Design contract. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Florida Department of Transportation (FDOT) District 4 Fort <br />Lauderdale Sistrunk Neighborhood Phase III Pedestrian Enhancements <br />Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager: For this pedestrian and streetscape enhancement project in the City of Fort Lauderdale’s Sistrunk neighborhood, we coordinated landscape architecture design and post- <br />design services with the FDOT, City, residents, and the landscape contractor including tree removal and landscape installatio n. The project improvements included the addition of <br />sidewalks, decorative lighting, milling and resurfacing, drainage and landscape. These enhancements aimed to restore Sistrunk ’s streets to pedestrian-friendly, vibrant corridors, and help <br />revitalize the neighborhood and its economy. This off-system project was completed under a Districtwide Minor Projects contract as a subconsultant to Stanley Consultants, Inc. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Florida Department of Transportation (FDOT) District 4 <br />SR 838/Sunrise Blvd. Bridge over Middle River <br />Fort Lauderdale, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager: Miller Legg’s Team provided in-house design services for the replacement of the Sunrise Blvd. Bridge over the Middle River. This project was a pilot project for the <br />FDOT's BOLD Initiative instituted by the Governor. Extensive coordination with the City of Fort Lauder dale involved design efforts that included special architectural wall/vertical features, <br />Florida Friendly landscape design, as well as hardscape and irrigation to ensure a Context Sensitive Solution was provided as an entry point to the eastern Fort Lauderdale beach <br />communities along the Middle River. Post Design services were also provided. This project was part of a multi-year in-house continuing service contract for FDOT District 4. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />Florida Department of Transportation (FDOT) District 6 D/B I-395 <br />from W of I-95 to MacArthur Causeway Bridge <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager: For this high-profile complex design-build project, Miller Legg is on the team as a subconsultant for the 'Heritage Trail' under I-395 to provide landscape architecture <br />and irrigation design services to the team of Archer Western/deMoya/Pevida Design Group. The initial phase of work includes disposition of over 2000 trees and palms, including, <br />relocation, permitting and coordination with the City of Miami, Miami Dade Expressway Authority (MDX) and the FDOT. Project area includes the roadways, connectors and infield areas of <br />SR 836 from 27th Avenue to 7th Avenue, I-395 from 7th Avenue to Biscayne Bay and I-95 from NW 8th Street to NW 29th Street. <br />STANDARD FORM 330 (1/2004) PAGE 2