|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Miguel Juncal, RLA, CA
<br />13.ROLE IN THIS CONTRACT
<br />Landscape Architect -
<br />Landscape / Hardscape / Irrigation
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />14
<br />b.WITH CURRENT FIRM
<br />9
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Miller Legg, Miami, FL
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Landscape Architecture, Minor in Environmental Sciences 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)FL, Registered Landscape Architect
<br />FL, FDOT Intermediate Maintenance of Traffic
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Mr. Juncal is a Landscape Architect focused on a variety of public and private landscape architecture projects including road way landscaping and irrigation, active and passive park landscape design, as well asresidential and commercial projects.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Sunny Isles Beach Pelican Community Park
<br />Sunny Isles Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008 / 2013
<br />CONSTRUCTION (If
<br />Applicable)
<br />2008 / 2013
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Landscape Designer: A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field,
<br />recreation building, playground structure, gymnasium, related site amenities and secured a Florida Recreational Development Assistance Program (FRDAP) grant for $200,000. The Miller
<br />Legg Team received recognition from the City for their involvement in the design completion. In 2013, the firm provided plans preparation and permitting associated with the
<br />reconstruction of the natural turf fields at this Park and Senator Gwen Margolis Park with artificial turf.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Miami Capital Improvement Program (CIP) Landscape
<br />Architecture Continuing Services (2016-2020)
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Landscape Architect: Miller Legg holds a Miscellaneous Landscape Architecture Continuing Services contract for Miscellaneous Projects the City of Miami Department of Capital Improvements
<br />and Transportation Program. The scope of work under this contract spans all comprehensive landscape architectural professional services including: master planning of site developments
<br />and roadway beautification projects, which can encompass site and environmental analysis, landscape programming, visual impac t landscape assessments, schematic and figure development
<br />for charrettes and public community meetings. Additional scope items may include design management and production of contract specifications and plans, permit approval and post-
<br />design services.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Florida Department of Transportation (FDOT) District 6
<br />US 1/Biscayne Blvd. 199th Avenue Intersection Improvements
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If
<br />Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Landscape Architect: Miller Legg provided landscape architecture design services for this project as a subconsultant to RJ Behar. Services include d data collection, site inventory and
<br />analysis, planting and irrigation design, tree inventory, cost estimating, technical specifications, quality assurance/quality control and other support and coordination activities.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />Florida Department of Transportation (FDOT) District 6
<br />Biscayne Boulevard (NE 5th Street to NE 13th Street)
<br />Miami, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2002
<br />CONSTRUCTION (If
<br />Applicable)
<br />2007
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Landscape Designer: In order to continue the enhancements of the US 1 Corridor for the City of Miami, Miller Legg developed a streetscape design to unify the area surrounding the
<br />American Airlines Arena, Museum Park and the Performing Arts Center. Enhancement of the pedestrian corridor and integration w ith the existing Roberto Burle Marx paving design,
<br />directly to the south, was integral in the design of the project. Miller Legg coordinated with the City of Miami during the design process, participated in numerous public involvement
<br />and design meetings, and incorporated access management concepts, including limited vehicular access and multi-modal transportation. Improvements included specialty paving, lighting,
<br />irrigation and planting elements. This project was part of a multi-year continuing service contract with FDOT District 6.
<br />e.
<br />(1)TITLE AND LOCATION (City and State)
<br />Florida Department of Transportation (FDOT) District 6
<br />D/B I-395 from W of I-95 to MacArthur Causeway Bridge
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If
<br />Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Landscape Architect: For this high-profile complex design-build project, Miller Legg is on the team as a subconsultant for the 'Heritage Trail' under I-395 to provide landscape architecture
<br />and irrigation design services to the team of Archer Western/deMoya/Pevida Design Group. The initial phase of work includes disposition of over 2000 trees and palms, including,
<br />relocation, permitting and coordination with the City of Miami, Miami Dade Expressway Authority (MDX) and the FDOT. Project area includes the roadways, connectors and infield areas of
<br />SR 836 from 27th Avenue to 7th Avenue, I-395 from 7th Avenue to Biscayne Bay and I-95 from NW 8th Street to NW 29th Street.
<br />STANDARD FORM 330 (1/2004) PAGE 2
|