Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Dylan Larson, CEP, PWS, CLI, GTA <br />13. ROLE IN THIS CONTRACT <br />Senior Biologist - <br />Environmental / Permitting <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />26 <br />b.WITH CURRENT FIRM <br />25 <br />15.FIRM NAME AND LOCATION (City and State) <br />Miller Legg, Ft. Lauderdale, FL <br />16.EDUCATION (DEGREE AND SPECIALIZATION)Bachelor of Science, Biology and Business Administration <br />Master of Business Administration, <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)Professional Wetland Scientist <br />Certified Environmental Professional <br />FL, Certified Landscape InspectorFL, Authorized Gopher Tortoise Agent <br />Wetland Delineation Certification <br />PADI Certified Rescue Diver 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />As Principal, Mr. Larson oversees operations and overall project management for the firm. He also has significant experience in environmental consulting in Florida and is responsible for directing studies and <br />investigations on biological and ecological aspects of the firm’s projects. Specific environmental responsibilities include: field evaluations, assessments, recommendations and report writing, as well as wetland jurisdictional <br />determination, dredge and fill permitting, wetland mitigation design, mitigation monitoring, recommendations for maintenance procedures, coordinati on and oversight of environmental GIS applications, and assistance <br />with plan preparations and mitigation. <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />City of Miami Beach South Beach Tree and Dune Inventory <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal-In-Charge: Miller Legg and its Certified Arborists conducted a comprehensive tree and dune vegetation inventory on a section of South Be ach east of the pedestrian walk from <br />3rd to 5th Streets. All 300 tree species found within the area were inventoried as point locations with associated attributes and all dominant shrub and ground cover species were <br />collected as polygon data with associated percent coverage and species data. The information was then displayed on a digital map and the data was provided to the client in .shp file <br />format. Miller Legg was a subconsultant to Coastal Systems International. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Coastal Construction Control Line (CCCL) Permitting Miami Beach <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal-in-Charge: Miller Legg assisted a landscape architectural firm EDAW (as a sub) with the processing of a CCCL (Coastal Construction Contr ol Line) Permit through FDEP. In <br />particular, the firm prepared a CCCL survey, through a combination of field ground truthing and CAD work. Miller Legg then related the proposed improvement features to the CCCL in <br />CAD drawings which were submitted to FDEP as part of the CCCL permit application. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Boynton Beach Oceanfront Park Boardwalk <br />Boynton Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If <br />Applicable) <br />2011 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Principal-in-Charge: Miller Legg was the prime consultant for the replacement of existing boardwalk and minor structures at the 12-acre Oceanfront Boardwalk Park in Boynton Beach. <br />The goal of the City was to renovate their only beach access park. Other elements of this improvement project included hardscape, lighting and landscape. Services provided by the <br />Miller Legg team included environmental permitting, surveying, architectural design, structural engineering, electrical engin eering, landscape architecture, site analysis, construction <br />documents and construction observation services. This project required extensive coordination with the City’s Park & Recreat ion Department, Public Works Department, Purchasing <br />Department, Building Department, and various subconsultants. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Broward County Parks and Recreation West Lake Park II - <br />Environmental Services <br />Hollywood, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager: Miller Legg was the prime consultant for the permitting and design of enhancements for the second phase of this 1,500-acre estuarine wetland. The firm has provided <br />both environmental and engineering services for necessary mitigation for the Port Everglades and Ft. Lauderdale-Hollywood International Airport expansion projects. Services provided <br />included: paving and drainage improvements for the nature center and associated parking lot, design of three sewage pump stat ions, water distribution system design, sanitary sewage <br />collection and transmission system design, off-site force main, traffic engineering, surveying, water quality data analysis, hypothesis development and review, sediment ana lysis, fishery <br />analysis, rip-rap design, benthic macro-invertebrate identification, seagrass survey, mitigation credit determination, and USACE dredge and fill permitting. The seagrass survey was <br />conducted using scuba diving and digital global positioning satellite equipment and included transect/quadrant measurements o f seagrass density, abundance, and frequency of occurrence. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />City of Fort Pierce Coastal Construction Control Line Permitting <br />Fort Pierce, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If <br />Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager: Through our continuing services contract with the City, Miller Legg provided Coastal Construction Control Line Permitting ser vices for Jetty Park, Kimberly Bergalis Park <br />and South Beach Boardwalk Park. Services included existing site condition analysis, on-site jurisdictional determination, and preparation and submittal of applications and sketches <br />indicating project plan with mitigation, and support data to the Florida Department of Environmental Protection. Miller Legg also prepared a mitigation plan for Kimberly Bergalis and <br />South Beach Boardwalk Parks, which included designing a plan to offset dune impacts associated with the proposed improvements . <br />STANDARD FORM 330 (1/2004) PAGE 2