My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 6 <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />22. EXAMPLE PROJECT KEY <br />NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />MD- EDP - Bridge 874420 Replacement over C-100A Canal along SW 136th St <br />between SW 70 Ave and SW 72 Ave <br />PROFESSIONAL SERVICES On-Going CONSTRUCTION (if appl.) <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Miami-Dade County <br />b. POINT OF CONTACT NAME <br />Alejandro Uribe, Gannett Fleming <br />c. POINT OF CONTACT TELEPHONE <br />NO. <br />305-908-3935 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br /> <br />This project consists of replacing the bridge currently spanning over the C-100A Canal along SW 136 Street, <br />within Miami-Dade County Commission Districts 7 and 8, the Village of Pinecrest and the Village of Palmetto <br />Bay. The existing bridge, originally built in 1966 and classified as functionally obsolete, will be replaced with a <br />new concrete bridge that provides wider concrete sidewalks and shoulders on both sides greatly enhancing <br />pedestrian and bicycle features. The project also includes improving the approach roadways by milling and <br />resurfacing, shoulder widening, new pavement markings, and shoreline protection adjacent to the new bridge. <br />Construction is anticipated to begin in early 2020. Contract: $30,961 (PI Fee). <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Media Relations Group <br />(2) FIRM LOCATION (City and State) <br />Miami, FL <br />(3) ROLE <br />Public Involvement <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />f. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.