<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />JUAN H. VAZQUEZ, P.E., P.H., BCEE
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Hydrology
<br />
<br />
<br /> 14. YEARS EXPERIENCE
<br />
<br /> a. TOTAL
<br />34
<br />
<br /> b. WITH CURRENT FIRM
<br />19
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />B.S., Civil Engineering, University of Puerto Rico/1985
<br />Professional Hydrologist – License No. 05-H-1653
<br />Board Certified Environmental Engineer 07-20009/2007
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />P.E. No. 51143 Florida/1996
<br />P.E. No. 0402 025604 Virginia/1994
<br />
<br />P.E. No. 11385 Puerto Rico/1989
<br />P.E. No. 46482 Michigan/1999
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Vazquez is a member of the American Society of Civil Engineers, Association of Engineers and Land Surveyors of Puerto Rico, American
<br />Society of Highway Engineers, American Public Works Association, American Institute of Hydrology, Florida Institute of Consul ting Engineers
<br />Water Resources Committee Member, and American Academy of Environmental Engineers. For the 6th year in a row, He is in the “Who’s Who
<br />book of Environmental Engineering, 2019”. He is Board Certified Environmental Engineer with specialty in Water Supply and Wastewater.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Tressler Street Drainage Improvements - City of North Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager/QC Assurance for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration
<br />trenches, solid piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand built catch
<br />basins, swale retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction.
<br />Also included estimates, utility coordination, permitting and bid assistance. Cost/Fees Paid: $90,949; Construction Cost: $1,100,000 (Estimated)
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 87th Avenue (SR-973/Galloway Road) Miami-Dade County, Florida – FDOT,
<br />District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record for drainage and preparation of the NW 87th Avenue Bridge Hydraulic Report. Project length: 2 miles; FM#: 405615-3-52-01
<br />Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00 (Estimated).
<br />
<br />c
<br />(1) TITLE AND LOCATION (City and State)
<br />MS4 NPDES Stormwater Assessment Program, City of Hialeah, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager for the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System Permit
<br />that was issued June 30, 2016. This permit covers all areas located within the political boundary of the City of Hialeah that is served by the MS4
<br />owned or operated by the City. The purpose of this assessment program is to provide information for the City of Hialeah to determine the overall
<br />effectiveness of its Stormwater Management Program (SWMP) in reducing stormwater pollutant loadings from its Municipal Separate Storm
<br />Sewer System (MS4) to receiving water bodies. Cost/Fees Paid: $9,772; Construction Cost: N/A
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />43-year CDBG improvements, NW 2nd Avenue from NW 4th Street to NW 5th Street -
<br />City of Hallandale Beach, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Engineer of Record for the drainage design of City streets improvements. These improvements will upgrade physical/aesthetic appearance that
<br />will complement housing development and rehabilitation as well as promote more attractive neighborhoods. In general, the improvements include
<br />sidewalk replacement, minor drainage improvements, milling and resurfacing, new ADA compliant ramps and sodding.
<br />Cost/Fees Paid: $28,155 – Construction Cost: $87,000.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lakeshore and River Run Park Improvements – City of Miramar, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and EOR for master planning and civil design of the improvements. Improvements included building modificatio ns, additional
<br />parking, new lighting, grading and drainage and reconfiguration of existing parking, and park appurtenances such as benches, trash collectors,
<br />new fountains and playgrounds. Cost/Fees Paid: $118,604.64 – Construction Cost: $700,000.00.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|