|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME
<br />PAOLA RIVEROS, PE
<br /> 13. ROLE IN THIS CONTRACT
<br />Civil Engineering, Signals
<br /> 14. YEARS EXPERIENCE
<br />a. TOTAL
<br />19
<br />
<br /> b. WITH CURRENT FIRM
<br />19
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />B.S. Civil Engineer, Florida International University/2001
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> P.E. Florida No.74249/2012
<br /> P.E. Washington, D.C., No. 905769/2010
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. Riveros has been responsible for the preparation of roadway plans, drainage plans and site plans throughout South Florida. Ms. Riveros is
<br />fully knowledgeable of Microstation V8. Ms. Riveros completed a computer course with introduction to GIS software in the application to
<br />contamination of surface water bodies to determine affected zones by the plume. She has worked in several water and sewer projects.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />I-95 at 6th Avenue Interchange Final Design, Palm Beach County, Florida –
<br />FDOT, District 4
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager responsible for the interchange improvements, which includes a Level IV CAP, six typical sections, pavement d esign, access
<br />management, TCP plans, temporary lighting on all ramps, drainage, utility coordination, Environmental Permits, signing and marking plans,
<br />signalization and complete management of all subconsultants. The project also includes milling and resurfacing, adding bike lines, upgrading
<br />roadway signs and curb ramps to meet the current ADA standards, adding exclusive right turn lanes, and modifications to existing CSX tracks and
<br />overhead railroad structure. Project #: 436963-1-32-01; Project Length: Interchange; Cost/Fees Paid: $750,000.00; Construction Cost: $TBD.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners
<br />LLC/Miami-Dade County
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: She is responsible for assisting with the roadway design, drainage design, signing and pavement markings, signalization,
<br />lighting, wetland assessment, and utility coordination. NE 151st Street is an off-system roadway bound by the Florida Greenbook, for its design
<br />criteria. Drainage design includes a series of interconnected French drains with drainage wells. Project Length: 0.876 miles
<br />Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000.00
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />SW 35th Avenue from SW 29th Street to SW 28th Street – City of Miami, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Assistant Project Manager in charge of civil engineering servicees, milling and resurfacing, pavement marking and signing, A DA ramps, drainage
<br />improvements, permitting, utility coordination, cost estimates, and construction administration services.
<br />Project Number: B-173610; Project Length: 0.117 miles; Cost/Fees Paid: $40,908.00; Construction Cost: $216,142.20 (Estimate).
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lyons Park Neighborhood Improvement Project, Broward County, Florida – City
<br />of Pompano Beach
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer for the preparation of the 3D models for development of street profiles.
<br />Project #: 20140815 Project Length: Neighborhood
<br />Cost/Fees Paid: $409,793 – Construction Cost: $15,000,000 (Estimated).
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Billie Johns Street Roadway Improvements, Hendry County, Florida – Seminole
<br />Tribe of Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: Ms. Riveros was in charge of the roadway and drainage design and the utility coordination for the project. This project consisted
<br />of improvements to Billie Johns Street from 0.67 miles SE of Medicine Man Drive to Medicine Man Drive Boulevard in the Big Cypress
<br />Reservation. Billie Johns Street is classified as a residential rural street.
<br />Project #: S5332104 Consultant Fees: $168,759.00; Construction Cost: $1,100,000 (Estimate); Project Length: 0.68 miles.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />
|