|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME HANS MURZI, PE, CFM
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Hydrology
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />17
<br />
<br /> b. WITH CURRENT FIRM
<br />5
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />M.S. Environmental Engineering Florida International
<br />University/2002
<br />B.S. Chemical Engineering, University of Los Andes, Merida,
<br />Venezuela/2000
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />P.E. Florida License No. 67767/2008
<br />Certified Floodplain Manager
<br />Qualified Stormwater Management Inspector
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Murzi is a water resources engineer with fifteen years of experience including hydrologic and hydraulic analysis and modeling of rivers and
<br />flood control systems, natural resources restoration projects, and watershed management. Also, rural and roadway drainage design , drainage
<br />field inspections, drainage plan reviews and QA/QC of water resources models and drainage reports. The experience includes use of several
<br />computer programs such as XPSWMM, HEC-RAS, AdICPR, MIKE SHE/MIKE 11, ASAD, ArcGIS. Mr. Murzi is a Certified Floodplain Manager.
<br />He is also member of the FICE Water Resources Committee.
<br />19. RELEVANT PROJ ECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lyons Park Neighborhood Improvement Project, Pompano Beach, Florida – City
<br />of Pompano Beach
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer: He is responsible for the preparation of the stormwater design of the proposed improvements. The project area suffers from
<br />flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage systems within the
<br />project area. Cost/Fees Paid: $409,793 – Construction Cost: $15,000,000 (Estimate).
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Central Broward Water Control District (CBWCD) Enginee r Services – Broward
<br />County, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />District Engineer responsible for the reviewing plat submittals, paving and grading plans and as-built plans for development permits in the
<br />CBWCD. Responsibilities include; ensuring that all site plans comply with CBWCD engineering criteria, review and evaluate requests for
<br />variances, provide technical support to CBWCD Board during public hearings for variances request. Site visits are performed as necessary as
<br />well as coordination with CBWCD staff in order to ensure that site development requirements are met. Project Length: Not applicable
<br />Cost/Fees Paid: $425,948.07 (as 12/20/2019) – Construction Cost: Not Applicable.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Preparation of fill and dredge plans and permitting packages for SFWMD (ERP and ROW) and USACE (Sections 404 and 408). The project
<br />includes repair of damaged seawalls after hurricane Irma.
<br />Cost/Fees Paid: $41,961.37; Construction Cost: $134,248.00 (Estimate)
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miscellaneous Drainage Projects, City of Doral, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Drainage Engineer/Engineer of Record: He was responsible for design of drainage improvements at several locations, supervising the
<br />preparation of plans and permitting of the improvements. Project Length: Varied
<br />Cost/Fees Paid: $21,395.50 Construction Cost: $177,539.50
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Stormwater Master Plan Implementation for NW 29th Street and NW 31st
<br />Street – City of Doral, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager responsible for providing drainage improvements to two (2) specific locations identified in the City’s master plan as sub basin D-
<br />3. He is providing the design of the drainage improvements, permitting, French drains.
<br />Project Cost: $32,600 – Construction Cost: $580,000 (Estimated).
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|