Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12. NAME <br /> JASMANI RIVERON, MS, PE <br /> 13. ROLE IN THIS CONTRACT <br />Maintenance of Traffic & Construction <br />Staging, Signing & Pavement Marking <br /> 14. YEARS EXPERIENCE a. TOTAL 10 <br /> b. WITH CURRENT FIRM 9 <br /> 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 12788 Forest Hill Boulevard, Suite 2003B <br />Village of Wellington, FL 33414 16. EDUCATION (Degree and Specialization) M.S. Civil Engineering (Structural, Construction, Geotechnical Engineering) FIU, Miami, Florida/2009 <br />B.S. Civil Engineering, FIU, Miami, Florida/2008 <br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) P.E. Florida No. 73798/2011 <br /> <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Riveron has experience with civil, roadway, maintenance of traffic (MOT), signing, pavement, marking, channelization as well as lighting. His <br />computer skills include AutoCAD, Open Roads, ArcMap, ANSYS, ETABS and MathCad. <br />19. RELEVANT PROJECTS <br /> a. <br />(1) TITLE AND LOCATION (City and State) Haverhill Road from Caribbean Boulevard to SR-710 widening, Palm Beach County, FL - Palm Beach County Department of Engineering & Public Works Division of Roadway Production (PBCDEPWDRP) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer responsible for roadway design, permitting, signing and pavement markings, signal modifications, temporary traffic control <br />plans (TTCP), and utility coordination. Project Number: 2013528 Project Length: 1.65 miles; Cost/Fees Paid: $582,734.24 - Construction Cost: <br />$9,000,000 (Estimated) <br /> b. <br />(1) TITLE AND LOCATION (City and State) Pompano Beach Mobility Sidewalks, Broward County, Florida – Florida Department of Transportation (FDOT), District 4 <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager responsible for preparing roadway, signing and marking plans, and specifications. The scope of this project consists of <br />providing pedestrian sidewalk connectivity along 3 local roads within the City of Pompano Beach. The services include regrading grass swales <br />and minor drainage modifications. Project #: 437785-1-32-01 Cost/Fees Paid: $224,020.00 - Construction Cost: TBD <br /> c. <br />(1) TITLE AND LOCATION (City and State) Summit Boulevard over LWDD E-3 Canal Slope Stabilization, Palm Beach County, Florida – PBCDEPWDRP <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2018 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer responsible for the production of roadway plans, signing, marking, channelization, Temporary Traffic Control Plans (TTCP), <br />permitting, and utility coordination. Project Number: 2015524 Project Length: 0.025 miles (LF 128.26) Cost/Fees Paid: $297,391.00 (Estimate) – <br />Construction Cost: $78,499.50 <br /> d. <br />(1) TITLE AND LOCATION (City and State) Jog Road Slope Stabilization, Palm Beach County, Florida – PBCDEPWDRP (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer responsible for roadway design which included signing & marking, channelization, TTCP, permitting, utility coordination. <br />Services include drainage analysis, structures, cost estimates and post design services. Project Length: 0.372 miles (LF 1,966.43); Project <br />Number: 2014614 Cost/Fees Paid: $94,843.00; <br /> e. <br />(1) TITLE AND LOCATION (City and State) Jog Road Slope Stabilization, Palm Beach County, Florida – PBCDEPWDRP (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2017 <br />CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Engineer responsible for roadway design including signing & Marking, permitting, utility coordination. Services include drainage analysis, <br />structures, cost estimates and post design services. Project Length: 0.372 miles (LF 1,966.43); Project Number: 2014614 Cost/Fees Paid: <br />$94,843.00 <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2