|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME
<br />JOSSMEL CRUZ-GARCIA, MS
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />Structural/Roadside Barriers &
<br />Guiderails/Designer
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />2
<br />
<br /> b. WITH CURRENT FIRM
<br />2
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />R.J. BEHAR & COMPANY, INC.
<br />6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, Florida 33332
<br />16. EDUCATION (Degree and Specialization)
<br />M.E. Structural Engineering, University of Puerto Rico, July 16, 2017
<br />B.S. Civil Engineering, University of Puerto Rico, June 2015
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />At RJ Behar, he works in the design of structural elements and performs construction inspections of infrastructure and building
<br />projects. He has a thorough understanding of advanced structural engineering and the associated computer skills.
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br /> Inverrary Estates Privacy Wall, Broward County, Florida – City of Lauderhill
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />He is responsible for the foundation design and structural details of the preparation of Construction Documents for the construction of
<br />approximately 2,750 feet of an 8-foot prefabricated privacy wall at Inverrary Estates. The project will also include the continuation of landscape
<br />and irrigation design along NW 44th Court and a meandering sidewalk design.
<br />Cost/Fees Paid: $33,475 - Construction Cost: $850,000 (Estimated).
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Paint Two Bridges of Turnpike Main Line over Rim Ditch Canal (C-24) in St.
<br />Lucie County, Turnpike Enterprise
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Designer in charge of construction plans and specification package to facilitate the repainting of the structural steel components and the
<br />recoating of the concrete surfaces of the bridges and adjacent walls located on or over the SR 91 (Florida’s Turnpike) in St. Lucie Co unty. He
<br />conducted the field inspection and is working on the plans preparation. Project #:100853 Project Length: 0.06 Miles
<br />Cost/Fees Paid: $81,125.00 Construction Cost: $TBD.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2019
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Lead Engineer for designing rows of pre-stressed soil anchors (or similar drilled-in tiebacks) to provide horizontal resistance for the
<br />upper portion of an existing seawall. The repair will run the full length of the south pump station seawall plus roughly 10’ on each side of the pump
<br />station building. Structural design of the wall will follow the requirements and recommendations of the Flor ida Department of Transportation
<br />Structure Design Guidelines, dated January 2016, Chapter 3 for Retaining Walls. Wall design calculations, assumptions, etc., will be documented
<br />in a computation book report. He is also responsible for assisting with hydraulic calculations, estimates of probable cost and permitting. Cost/Fees
<br />Paid: $41,961.37 – Construction Cost: N/A.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Seawall Design at Tobie Wilson Park, Miami-Dade County, Florida – Town of
<br />Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Engineer who is assisting with the structural analysis and design, and plans preparation. The scope of work will include design of
<br />approximately 850 feet of a new bulkhead wall located along the south bank of the Miami Canal.
<br />Cost/Fees Paid: $112,000 – Construction Cost: $2,800,000 (Estimated).
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Lakeside Community Hurricane Damage Repair, Miami-Dade County, Florida –
<br />Town of Medley
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Structural Lead Engineer for preparing technical specifications for damaged seawalls due to Hurricane Irma. Erosion contr ol methods, pollution
<br />prevention precautions, and earthwork construction are included in the project. He prepared a comprehensive structural assessment report,
<br />identifying any seawall deficiencies along the whole perimeter of the Lakeside Community Center . He participated in preparing all of the FEMA
<br />documents required to secure funding for the repairs. Cost/Fees Paid: $11,000.00 – Construction Cost: N/A.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|