|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br /> 12. NAME
<br />NANETTE AKYAZ
<br />
<br /> 13. ROLE IN THIS CONTRACT
<br />
<br />Maintenance of Traffic, Signals, Signing &
<br />Pavement Marking/Designer
<br />
<br /> 14. YEARS EXPERIENCE
<br /> a. TOTAL
<br />20
<br />
<br /> b. WITH CURRENT FIRM
<br />18
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> R. J. BEHAR & COMPANY, INC.
<br /> 6861 SW 196th Avenue, Suite 302
<br /> Pembroke Pines, FL 33332
<br />16. EDUCATION (Degree and Specialization)
<br />A.A. Degree/Broward Community College/1992
<br />
<br /> 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br /> N/A
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and civil engineering projects.
<br />She has seventeen years of experience in plans preparation on civil engineering projects.
<br />FDOT Cadd Update Training Seminar, FDOT PPM Design Update Training, AutoCAD Release 12 - Florida International University,
<br />FDOT/FICE - Load and Resistance Factor Design (LRFD) Training, Geopak Road 1 Training.
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Haverhill Road from N. of Caribbean Boulevard to Bee Line Highway, Palm
<br />Beach County, FL - Palm Beach County
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer: She is responsible for roadway design plans. The scope of services includes drainage improvements, signalization, pavement
<br />and marking, Temporary Traffic Control Plans (TTCP), utility coordination and permitting. Project Length: 1.65 milesCost/Fees Paid: $582,734.24
<br />- Construction Cost: $9,000,000.00 (Estimated)
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />NW 87th Avenue, Miami-Dade County, Florida – Florida Department of
<br />Transportation (FDOT), District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Roadway Designer: She assisted with roadway design and was responsible for quantities. The scope of services for this project includes
<br />Roadway/Traffic Control Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, bridge construction,
<br />utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services. Project Length: 2 miles.
<br />FM#: 405615-3-52-01 – Cost/Fees Paid: $2,994,823.00 – Construction Cost: $34,800,000.00 (Estimated).
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR-5/US-1/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th
<br />Street, Miami-Dade County, Florida – FDOT, District 6
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer responsible for the production of the roadway plans. The scope of services includes milling and resurfacing, signing and
<br />pavement markings, traffic control plans and ADA and pedestrian features upgrades. Project Length: 1.2 miles Project No.: 414624-3-32-01;
<br />Cost/Fees Paid: $228,638.00 – Construction Cost: $3,520,907.11
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />E. 6th Avenue to E. 8th Avenue from Hialeah Drive to E. 5th Street – City of
<br />Hialeah, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer: She was responsible for the plans preparation. The scope of this project consisted of roadway reconstruction and some
<br />roadway milling and resurfacing for a two-lane road, curb and gutter Type F, curb valley gutter, sidewalk, on-street parking, exfiltration drainage
<br />system, storm sewers, sodding, signing and pavement markings and roadway lighting. Cost/Fees Paid: $185,378.00 - Construction Cost:
<br />$2,983,967.00 - Project Length: 1.210 Miles
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR-7/US-441 Roadway Lighting and NW 11th Place Pedestrian Lighting
<br />Improvements, City of Lauderhill, Florida – FDOT, District 4; LAP Project
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Designer: She was responsible for the plans preparation. The scope of this project included milling and resurfacing, installation of
<br />decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This was a FDOT Local Agency Program (L AP) Project.
<br />Project No.: 424311-1-52-1 Project length: 0.45 miles. Cost/Fees Paid: $65,601.00 – Construction Cost: $430,000.00
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
|