Laserfiche WebLink
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> 20. EXAMPLE PROJECT KEY <br /> NUMBER <br />1 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />DESIGN BUILD CRITERIA PACKAGE FOR GATEWAY PARK <br />PEDESTRIAN BRIDGE – CITY OF SUNNY ISLES BEACH, <br />FLORIDA <br /> PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER City of Sunny Isles Beach <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br />b. POINT OF CONTACT NAME Ms. Susan Simpson <br />Assistant City Manager <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 792-1800 <br />E-mail: ssimpson@sibfl.net <br /> 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The City of Sunny Isles Beach contracted R.J. <br />Behar & Company, Inc. (RJ Behar) to prepare a <br />conceptual design and design-build criteria <br />package (DB) for the Gateway Park Pedestrian <br />Bridge. The project involved the design and <br />construction of a pedestrian access bridge over <br />the westbound ramp of SR-826 (aka Sunny Isles <br />Boulevard) to connect a parcel of City-owned <br />property that lies between the eastbound and <br />westbound SR-826 ramps. <br /> <br />RJ Behar developed a preliminary concept plan; <br />preliminary design plans, obtained all the <br />necessary permits, and prepared the design-build <br />criteria package. The preliminary design included <br />the preparation and approval of the typical <br />section(s) package, the preparation and approval <br />of the pavement design(s), identified and obtained <br />approval of the design variances or exceptions, <br />and provided preliminary utility coordination. <br /> <br />RJ Behar also assisted with post design services for the project and reviewed the Contractor’s proposals and the selected <br />contractor-design team’s final construction plans. <br /> <br />Cost/Fees Paid: $57,000 │Construction Cost: $450,000 (Estimated) <br /> <br />Key Personnel: Robert J. Behar, PE – Principal in Charge │ Javier Rodriguez, PE – Project Manager │Andrea Virgin, PE, LEED AP <br />– Project Engineer │Yulet Miguel, PE – Project Engineer <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> a. <br /> (1) FIRM NAME <br />R.J. BEHAR & COMPANY, INC. <br /> (2) FIRM LOCATION (City and State) <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br /> (3) ROLE <br />Design Build Criteria Package <br />b. <br /> (1) FIRM NAME <br /> <br /> (2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />c. <br /> (1) FIRM NAME <br /> <br /> (2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />d. <br /> (1) FIRM NAME <br /> <br /> (2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3