My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />Reference 3: <br />Client Name: Lazaro Quintero, Acting Parks and Recreation Director - City of Doral <br />Address: 8401 NW 53rd Terrace, Doral, FL 33166 <br />Phone/Fax: (305) 593-6600 / (305) 593-6615 <br />Email: Lazaro.Quintero@cityofdoral.com <br />Project Title: Doral Glades Park Boardwalk and Wetland Preserve <br />Work Performed: Environmental, Permitting, GIS, Surveying, and Construction Administration <br />Project Location: Doral <br />Description: Doral Glades Park is a 25-acre recreational facility for which passive and active <br />elements are planned, including playing fields, community and nature pavilions, <br />fishing pier, walking trail and wetland boardwalk. Miller Legg provided a boundary <br />and topographic survey and was involved in the design and construction of the <br />wetlands and boardwalk, using GIS and surface water management support. <br />Construction administration services were performed for the boardwalk. The firm <br />coordinated with the City on permit compliance, exotic species removal, native <br />species and maintenance programs; value engineering and design for the <br />boardwalk(s) and pier(s). A Wetland Mitigation Plan was developed including GIS <br />maps and habitat evaluation for placement of the boardwalks in ideal locations <br />within the wetland. Finally, the firm was responsible for the preparation of <br />environmental resource permit (ERP) modification applications for boardwalk and <br />planting in wetland areas. <br />Year Completed: 2019 <br />Team Members: Dylan Larson, PWS, CEP, CLI, GTA; William Mohler, CA, CLI <br /> <br />F-9
The URL can be used to link to this page
Your browser does not support the video tag.