My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The following schematics show the erection of the main spine and ribs and the corresponding traffic <br />configurations: <br /> <br /> <br /> <br />One full nighttime <br />road closure of Collins <br />Avenue to deliver and <br />erect each FUB beam <br />from barge delivery at <br />183rd Street. <br />Erection and <br />stabilization of main <br />structural member <br />performed without <br />traffic beneath. <br />Traffic can be <br />reopened each <br />morning with <br />temporary bracing <br />installed. <br />3 nights total. <br />Median and left turn <br />to 174th Street <br />temporarily removed. <br />6 lanes of traffic <br />maintained and <br />shifted to the west. <br />Pedestrian traffic <br />maintained on west <br />side of Collins Avenue. <br />Rib erection <br />performed in work <br />zone to the east. <br />D-28
The URL can be used to link to this page
Your browser does not support the video tag.