My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QA/QC Manager: George Patton, PE, an industry-recognized bridge engineering <br />expert has over 33 years of engineering experience with design, studies and analysis <br />on bridges of all sizes and complexities. Serving as H&H’s Chief Bridge Engineer, <br />George is responsible for technical direction and engineering of bridge studies, <br />replacement designs and rehabilitation projects. George will provide technical <br />oversight and ensure that H&H’s QA/QC program is administrated properly as it is <br />intended. <br />Notable Bridge Replacement Experience: <br />•FDOT D6 - 12th Avenue over Miami River (photo below) <br />•FDOT D4 - 17th Street Causeway over the ICWW <br />•FDOT D4 - Royal Park Bridge over ICWW <br />•Treasure Island Causeway over GICWW <br />12th Avenue over Miami River, Miami, Florida <br />E-6
The URL can be used to link to this page
Your browser does not support the video tag.