My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hardesty & Hanover
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Hardesty & Hanover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:56:17 PM
Creation date
1/14/2020 3:49:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assistant Project Manager: Ronald Sanchez, PE, has managed major bridge replacement, <br />rehabilitation and on-call bridge contracts in his 23 years with H&H. Ron is a structural <br />engineer with experience in leading bridge projects varying from large scale movable <br />bridges to minor bridge rehabilitations. With in-depth and successful experience in new <br />design, rehabilitation, and on-call contracts varying in scope from major to minor, he has <br />the proven ability to plan and deliver any type of project and the experience managing work <br />so that stringent schedules and budgets are met. Ron will provide project management <br />redundancy. <br />Notable Project Management Experience: <br />•Lee County - Sanibel Island Causeway over the GICWW (photos below) <br />•FDOT D4 - CSX Railroad over the North Fork of the New River <br />•FDOT D4 - North Causeway Bridge over ICWW <br />Sanibel Island Causeway over the GICWW, Sanibel Island, Florida <br />E-5
The URL can be used to link to this page
Your browser does not support the video tag.