Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRMLawrence Kline Managing Principal 34 7 <br />15. FIRM NAME AND LOCATION (City and State) <br />Perkins & Will Architects, Inc. / Coral Gables, Florida <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Master of Architecture, Syracuse University; Bachelor of <br />Science in Construction and Architecture, University of Florida <br />n/a <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />n/a <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City of Sunny Isles, Government Center Annex , Sunny Isles Beach, Florida 2014 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />The Sunny Isles Government Center Annex is the second phase of the Government Center. The Annex Project, located immediately to <br />the north, extends the Civic Plaza and develops a mixed-use program including Educational, Office, Community Auditorium, Retail and <br />Civic Expansion spaces with structured parking in both below-grade and above grade locations. Specific Role: Managing Principal; Scope: <br />Architecture, Interior Design, Landscape Architecture; Size: 113,000 sf; Cost: Confidential <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City Sunny Isles Beach Pedestrian Bridge, Sunny Isles Beach, Florida Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The pedestrian bridge design for Sunny Isles Beach at Government Center takes its inspiration from the geometric patterning of the medjool <br />date palm trunks that line the streetscape of Collins Avenue from north to south. The structure of the bridge will be steel frame repeating <br />sections that clear span Collins Avenue; that structural frame is encased in a light-weight concrete skin on both sides. Role: Managing <br />Principal <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City of Sunny Isles, Gateway Park, Sunny Isles Beach, Florida 2019 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />The studio features modular rooms that can be modified for quiet, focused work or available to host charrettes, design talks and immersive <br />digital presentations. The studio includes a creative virtual reality lab where clients are part of the digital practice. Three new place-making <br />elements were used in the creation of the space: a modular system, a slanted-slatted acoustic wood ceiling plane, and a central bar of <br />varied programmatic functions. Specific Role:Managing Principal; Scope: Architecture, Programming, Interior Design Services; Size: 16,000 <br />sf; Cost: Confidential <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)TREO SoMi Station, Miami, Florida Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />The mixed-use facility will be located adjacent to an existing light-rail transit station helping Miami-Dade County realize its goal of promot- <br />ing Transit Oriented Development. The project will showcase smart strategies for systems and future ready workplace, creating a different <br />brand and attitude of office space in the region. Size: 372,950 sf; Cost of Construction: $80 Million; Role: Principal-In-Charge <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)2800 Ponce De Leon Blvd., Coral Gables, Florida 2019 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Proposed interior and exterior improvements at 2800 Ponce de Leon Blvd. involve the revitalization of an urban plaza located at the base <br />of a fifteen-story office building bordering Ponce Circle Park’s western edge. The proposed design will transform this underutilized public <br />plaza into a vibrant, lush and biologically diverse urban garden The interior lobby, elevator lobby and food amenities will all be renovated <br />and improved upon. Specific Role: Managing Principal; Scope: Architecture, Interior Design, Landscape Architecture; Size: 11,153 sf; Cost: <br />Confidential <br />3838