|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRMPat Bosch, LEED® AP Design Principal 33 23
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Perkins and Will | Coral Gables, Florida
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Master of Architecture, Columbia University
<br />Technology Diploma, ETH/Swiss Federal Institute of
<br />Technology
<br />LEED® AP
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />International Women’s Forum; Women’s Chamber of Commerce; Mayor’s Green Commission
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City of Sunny Isles Government Center Annex | Sunny Isles, Florida 2015 - Present Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />The Annex Project, located immediately to the north of the Government Center, extends the Civic Plaza and develops a mixed-
<br />use program including Educational, Office, Community Auditorium, Retail and Civic Expansion spaces with structured parking in
<br />both below-grade and above grade locations. Size: 113,000 sf; Cost of Construction: N/A; Role: Design Principal
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City Sunny Isles Beach Pedestrian Bridge | Sunny Isles Beach, Florida Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />The pedestrian bridge design for Sunny Isles Beach at Government Center takes its inspiration from the geometric patterning of
<br />the medjool date palm trunks that line the streetscape of Collins Avenue from north to south. The structure of the bridge will be
<br />steel frame repeating sections that clear span Collins Avenue; that structural frame is encased in a light-weight concrete skin on
<br />both sides. Role: Design Principal
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City of Sunny Isles, Gateway Park , Sunny Isles Beach, Florida 2019 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />The studio features modular rooms that can be modified for quiet, focused work or available to host charrettes, design talks and immersive
<br />digital presentations. The studio includes a creative virtual reality lab where clients are part of the digital practice. Three new place-making
<br />elements were used in the creation of the space: a modular system, a slanted-slatted acoustic wood ceiling plane, and a central bar of
<br />varied programmatic functions. Specific Role:Design Principal; Scope: Architecture, Programming, Interior Design Services; Size: 16,000 sf;
<br />Cost: Confidential
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)American Express Sunrise Corporate Center, Sunrise, Florida 2011 2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />The American Express Sunrise Corporate Center is a 443,000 square foot office building on a 40.8 acre parcel located in
<br />Sunrise, Florida. The office building is planned to be 5 stories with a two story parking garage located adjacent to the building.
<br />Additionally, a stabilized grassed and landscaped area to the east of the parking structure will provide for any potential overflow
<br />parking. Size: 360,000 sf; Cost: N/A; Role: Design Principal
<br />e.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Miami Beach City Hall Annex, Miami Beach, Florida 2007-2009 2009
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />The structure accommodates a 7-level parking garage with a capacity of 654 parking spaces and a 5-story office component
<br />with 38,500 SF of gross floor area. A decorative screening envelops the parking structure, while the office component fronting
<br />Meridian Avenue features a glazed curtain wall. The scope of the project included the creation of a pedestrian plaza and pocket
<br />park in the south edge of the project, as well as the enhancement of the Meridian Avenue streetscape between 17th and 19th
<br />streets. Size: 300,000 sf; Cost: $23.5 million; Role: Design Principal
<br />39
<br />RFQ 20-07-01 / Continuing Professional Consulting Services (CCNA)
<br />39
|