Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME Leonte Almonte, P.E. <br /> <br />13. ROLE IN THIS CONTRACT Civil Engineering/Roadway Design 14. YEARS EXPERIENCE <br />a. TOTAL 18 b. WITH CURRENT FIRM 18 <br />15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., Coral Gables, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) Master of Science / Transportation Engineering / Florida <br />International University / 2006 <br />Bachelor of Science / Civil Engineering / Pontificia Universidad <br />Catolica Madre y Maestra / 2002 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL / Professional Engineer / 70822 / 2010 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> Has 18 years of roadway design experience specializing in roadway design, drainage design, signing and pavement marking, <br />signalization, and advanced traffic management system design <br /> Proficient in MicroStation, Geopak, Primavera P6, ArcGIS, AUTOTurn, Real Cost, MS Project, AASHTO Pavement ME <br /> 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Sunny Isles Beach Government Center-Pedestrian Bridge, City of <br />Sunny Isles Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If Applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer. As a subconsultant to another firm, Kimley-Horn provided civil engineering services for the Government Center- <br />Pedestrian Bridge. Our scope of services includes onsite civil engineering construction documents, onsite civil engineering permitting, <br />and limited onsite construction observation services. <br />b. <br />(1) TITLE AND LOCATION (City and State) Lincoln Road District Improvements, City of Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing <br />CONSTRUCTION (If Applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer. This is an ongoing project with City of Miami Beach for the redevelopment of Lincoln Road Pedestrian Mall. The <br />design included water features, streetscape, and infrastructure improvements. Kimley-Horn is currently providing civil engineering, <br />permitting, traffic signal modifications, and civil engineering design services for this project. This project includes the replacement of <br />8-inch sewer main, 12-inch water main, 24-inch storm pipe, and 30-inch force main along Meridian Avenue. <br />c. <br />(1) TITLE AND LOCATION (City and State) Reconstruction of Krome Avenue from South of SW 296 St to <br />South of SW 232 St, FDOT District Six <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If Applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Deputy project manager. Kimley-Horn is providing roadway, signing and marking, signalization, lighting, structures and landscape <br />design. This project is part of the Krome Avenue South Corridor and has several environmentally sensitive areas. This segment of <br />Krome Avenue handles part of the main freight activity in South and West Miami-Dade County, with a daily truck percentage of 15%. <br />d. <br />(1) TITLE AND LOCATION (City and State) Village of Key Biscayne Safe Routes to School, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If Applicable) 2011 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer. Design and development of plans for new sidewalk construction as part of the Safe Routes to School (SRTS) <br />program. The project included design of new sidewalk along both sides of NW 5th Avenue from NW 112th Terrace to NW 115th <br />Street, utility coordination, and preparation and submittal of LAP documents to FDOT. <br />e. <br />(1) TITLE AND LOCATION (City and State) Mowry Drive Roadway Improvements, City of Homestead, FL (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2014 <br />CONSTRUCTION (If Applicable) 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project engineer. Kimley-Horn was selected for the new construction and widening of Mowry Drive (SW 320th Street) from SW 157 <br />Avenue to SW 152 Avenue. The existing roadway consisted of a one-lane paved road and was proposed to be converted to a four- <br />lane divided urban section with bike lanes on both sides. The project included design and preparation of roadway, drainage, signing <br />and marking, lighting, water main extension, landscaping, and irrigation plans. As part of the project, environmental and drainage <br />permits were obtained from SFWMD, RER, and USACE. The project also included preparation of bid documents and construction <br />supervision. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br /> <br />51 <br />RFQ 20-07-01 / Continuing Professional Consulting Services (CCNA) <br />51