|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Leonte Almonte, P.E.
<br />
<br />13. ROLE IN THIS CONTRACT Civil Engineering/Roadway Design 14. YEARS EXPERIENCE
<br />a. TOTAL 18 b. WITH CURRENT FIRM 18
<br />15. FIRM NAME AND LOCATION (City and State) Kimley-Horn and Associates, Inc., Coral Gables, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) Master of Science / Transportation Engineering / Florida
<br />International University / 2006
<br />Bachelor of Science / Civil Engineering / Pontificia Universidad
<br />Catolica Madre y Maestra / 2002
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL / Professional Engineer / 70822 / 2010
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br /> Has 18 years of roadway design experience specializing in roadway design, drainage design, signing and pavement marking,
<br />signalization, and advanced traffic management system design
<br /> Proficient in MicroStation, Geopak, Primavera P6, ArcGIS, AUTOTurn, Real Cost, MS Project, AASHTO Pavement ME
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) Sunny Isles Beach Government Center-Pedestrian Bridge, City of
<br />Sunny Isles Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If Applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. As a subconsultant to another firm, Kimley-Horn provided civil engineering services for the Government Center-
<br />Pedestrian Bridge. Our scope of services includes onsite civil engineering construction documents, onsite civil engineering permitting,
<br />and limited onsite construction observation services.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) Lincoln Road District Improvements, City of Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing
<br />CONSTRUCTION (If Applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. This is an ongoing project with City of Miami Beach for the redevelopment of Lincoln Road Pedestrian Mall. The
<br />design included water features, streetscape, and infrastructure improvements. Kimley-Horn is currently providing civil engineering,
<br />permitting, traffic signal modifications, and civil engineering design services for this project. This project includes the replacement of
<br />8-inch sewer main, 12-inch water main, 24-inch storm pipe, and 30-inch force main along Meridian Avenue.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) Reconstruction of Krome Avenue from South of SW 296 St to
<br />South of SW 232 St, FDOT District Six
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If Applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Deputy project manager. Kimley-Horn is providing roadway, signing and marking, signalization, lighting, structures and landscape
<br />design. This project is part of the Krome Avenue South Corridor and has several environmentally sensitive areas. This segment of
<br />Krome Avenue handles part of the main freight activity in South and West Miami-Dade County, with a daily truck percentage of 15%.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) Village of Key Biscayne Safe Routes to School, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2011 CONSTRUCTION (If Applicable) 2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. Design and development of plans for new sidewalk construction as part of the Safe Routes to School (SRTS)
<br />program. The project included design of new sidewalk along both sides of NW 5th Avenue from NW 112th Terrace to NW 115th
<br />Street, utility coordination, and preparation and submittal of LAP documents to FDOT.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Mowry Drive Roadway Improvements, City of Homestead, FL (2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES 2014
<br />CONSTRUCTION (If Applicable) 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project engineer. Kimley-Horn was selected for the new construction and widening of Mowry Drive (SW 320th Street) from SW 157
<br />Avenue to SW 152 Avenue. The existing roadway consisted of a one-lane paved road and was proposed to be converted to a four-
<br />lane divided urban section with bike lanes on both sides. The project included design and preparation of roadway, drainage, signing
<br />and marking, lighting, water main extension, landscaping, and irrigation plans. As part of the project, environmental and drainage
<br />permits were obtained from SFWMD, RER, and USACE. The project also included preparation of bid documents and construction
<br />supervision.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
<br />
<br />51
<br />RFQ 20-07-01 / Continuing Professional Consulting Services (CCNA)
<br />51
|