Laserfiche WebLink
At the east and west ends of the <br />200-foot long bridge, elevator <br />and stair towers provide vertical <br />circulation and ADA access. The <br />elevators will have glass panels for <br />visibility and cameras within the <br />cabs and along the length of the <br />bridge for security. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />Perkins and Will Coral Gables, Florida Architecture <br />b.Kimley Horn Palm Beach, Florida Civil Engineering <br />c.BR+A Miami, Florida MEP/FP Engineering <br />This material will be a light tone so <br />that color-changing lighting for the <br />exterior will allow the city to highlight <br />the seasons, holidays and events <br />in the city of Sunny Isles Beach. <br />The western location of the bridge <br />lands in the Government Center <br />Plaza, this anticipates and respects <br />the future government expansion <br />project. Similarly, the eastern landing <br />is engaging and highlighting the <br />potential ocean views with easy <br />access to the beach walk. <br />55 <br />RFQ 20-07-01 / Continuing Professional Consulting Services (CCNA) <br />55