Laserfiche WebLink
CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) NO. 20-07-01 <br />14 <br />City of <br />procured services must meet District contractual requirements. The type and extent of verification shall be dependent <br />upon the type of service, historical performance or current status of the supplier/subcontractor. <br />Control of Monitoring and Measuring Devices - RADISE maintains procedures for the control, calibration and <br />handling of inspection, measuring and test equipment and performs annual re-certifications of its laboratories. All <br />inspection, measuring and test equipment used to perform analysis and testing for clientele shall be included in the <br />program. Equipment shall be calibrated according to manufacturer’s calibration specifications and procedures (if <br />available), otherwise documented calibration methods shall be established according to manufacturer’s specifications. <br />Internal Audits - RADISE shall conduct internal audits at periodic intervals to determine whether the implemented <br />RADISE QA/QC Program conforms to the contracted arrangements, and that it has been effectively implemented and <br />maintained. The purpose of the audits will be to verify that proper procedures, detailed checking, Independent <br />Technical Reviews and document control activities are being followed and performed. All audit findings become <br />documented non-conformances or corrective actions requiring corrective actions. <br />Corrective/Preventive Action - A documented procedure is in place that describes the corrective action process. <br />RADISE makes every effort to eliminate the cause of nonconformities, and potential nonconformities, in order to prevent <br />their recurrence. <br />Continuous Improvement - RADISE constantly seeks ways to continually improve the effectiveness of the Quality <br />Management System through the use of quality objectives, audit results, analysis of data, corrective and preventive <br />actions and Management Reviews. <br />Client Satisfaction Feedback Reviews - The Project Manager and Corporate Quality Control Manager shall initiate <br />periodic Client Feedback Satisfaction reviews with the District Project Manager and other District staff as appropriate. <br />The purpose of this review will be to solicit District feedback regarding contract performance or other issues requiring <br />attention by senior RADISE management. <br /> RADISE QUALITY CONTROL CMT REPORTING SYSTEM <br />Quality Control for RADISE construction materials testing reports is documented throughout each and every phase of <br />our projects. RADISE has proven quality assurance and control measures in place that have been developed based <br />on many years of experience. Our evolving and improving internal QA/QC program establishes the Performance <br />Standards, Policies, and Procedures by which our services are provided. Our QC Manual provides a guide for the <br />overall QC program. It includes engineering, construction-laboratory material testing, pre-design, design, construction, <br />and post-construction procedures and checklists aimed at accomplishing the overall goal of providing quality services. <br />RADISE recognizes that a comprehensive QC program involves everyone in the company; each with a different <br />responsibility, acting at different times, and at all levels of project participation. <br />RADISE QC System – RADISE has internally developed and utilizes a proprietary software known as the RADISE <br />QC System. RADISE’s QC System is an innovative, secure and easy-to-use Web-based system application used to <br />schedule, track, check and report all of our field and laboratory testing results – a first of its kind in the industry. Our <br />QC System was developed to minimize human error. <br />The QC System is a powerful testing and inspection based application that we have successfully used for the last 9 <br />years to manage and report test results for all of our projects. It is specifically set-up for the recipient and used to <br />schedule, track and report all of our field and laboratory testing. It even automatically schedules concrete cylinder <br />pickups 24 hours after a concrete pour was performed – eliminating issues with cylinders left in the field! It was designed <br />to remove human error in the field and in the laboratory. Once in the QC system, the reports are QC’d by the Service <br />Lead, prior to a third review and QA by the EOR, before signing and sealing. Our engineering reports require a minimum