Laserfiche WebLink
CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) NO. 20-07-01 <br />56 <br />City of <br /> <br /> <br />CURRENT WORKLOAD <br />Based on our history, experience and staff availability, RADISE foresees no issues in meeting The City’s schedule or <br />demands for the Services. We have full-time, local staff including multiple professional geotechnical engineers, <br />inspectors, numerous field and lab technicians, geotechnical drillers, and support personnel. RADISE has the available <br />personnel, equipment and processes in place to successfully and cost competitively perform the work required by the <br />City. We do not anticipate the current workload to affect our ability to achieve the City’s goals for this contract. <br />RADISE is proud to have recently been ranked #1 for several Geotechnical and Materials Testing, CEI <br />Continuing Services Contracts with local governments/municipalities: <br /> Palm Beach County <br /> School District of Palm Beach County <br /> Solid Waste Authority of Palm Beach County <br /> South Florida Water Management District <br /> Broward County School District <br /> <br />Availability of Key Staff and Resources <br />It is a priority for RADISE to provide outstanding support to The City throughout the Contract. We are aware of the <br />importance of providing responsive service and are committed to providing the necessary resources to ensure that all <br />assignments are completed to the satisfaction of The City. <br /> <br />DDEEDDIICCAATTEEDD KKEEYY PPRROOJJEECCTT SSTTAAFFFF WWOORRKKLLOOAADD <br />NNaammee PPrroojjeecctt PPoossiittiioonn CCuurrrreenntt PPrroojjeecctteedd <br />Andrew Nixon, PE. Contract/Project Manager 30% 70% <br />Gregory Stelmack, PE Deputy Contract/Project Manager 40% 60% <br />Kumar A. Allady, P.E. Principal In-Charge 20% 25% <br />Panneer Shanmugam, PE Quality Assurance 25% 35% <br />Tom Mullin, P.E. Chief Geotechnical Engineer 40% 50% <br />Akash Bissoon, PE Geotechnical Engineer 40% 60% <br />Sasidhar Ayithi, PE CEI Lead/ Lab Testing Manager 35% 65% <br />Newton Brooks Lab Manager 40% 60% <br />Winsor C. Pozo, E.I. Project Engineer 35% 55% <br />Aadithya Kurramboyina, E.I. Project Engineer 40% 60% <br />Bhanu “Vijay” Vallabhu Lead – Asphalt Testing 45% 55% <br /> <br />The matrix above notes the dedicated key staff and their current/projected workloads. <br /> <br />H. ADDITIONAL INFORMATION <br /> <br /> <br /> <br />CURRENT WORKLOAD <br />Based on our history, experience and staff availability, RADISE foresees no issues in meeting The City’s schedule or <br />demands for the Services. We have full-time, local staff including multiple professional geotechnical engineers, <br />inspectors, numerous field and lab technicians, geotechnical drillers, and support personnel. RADISE has the available <br />personnel, equipment and processes in place to successfully and cost competitively perform the work required by the <br />City. We do not anticipate the current workload to affect our ability to achieve the City’s goals for this contract. <br />RADISE is proud to have recently been ranked #1 for several Geotechnical and Materials Testing, CEI <br />Continuing Services Contracts with local governments/municipalities: <br /> Palm Beach County <br /> School District of Palm Beach County <br /> Solid Waste Authority of Palm Beach County <br /> South Florida Water Management District <br /> Broward County School District <br /> <br />Availability of Key Staff and Resources <br />It is a priority for RADISE to provide outstanding support to The City throughout the Contract. We are aware of the <br />importance of providing responsive service and are committed to providing the necessary resources to ensure that all <br />assignments are completed to the satisfaction of The City. <br /> <br />DDEEDDIICCAATTEEDD KKEEYY PPRROOJJEECCTT SSTTAAFFFF WWOORRKKLLOOAADD <br />NNaammee PPrroojjeecctt PPoossiittiioonn CCuurrrreenntt PPrroojjeecctteedd <br />Andrew Nixon, PE. Contract/Project Manager 30% 70% <br />Gregory Stelmack, PE Deputy Contract/Project Manager 40% 60% <br />Kumar A. Allady, P.E. Principal In-Charge 20% 25% <br />Panneer Shanmugam, PE Quality Assurance 25% 35% <br />Tom Mullin, P.E. Chief Geotechnical Engineer 40% 50% <br />Akash Bissoon, PE Geotechnical Engineer 40% 60% <br />Sasidhar Ayithi, PE CEI Lead/ Lab Testing Manager 35% 65% <br />Newton Brooks Lab Manager 40% 60% <br />Winsor C. Pozo, E.I. Project Engineer 35% 55% <br />Aadithya Kurramboyina, E.I. Project Engineer 40% 60% <br />Bhanu “Vijay” Vallabhu Lead – Asphalt Testing 45% 55% <br /> <br />The matrix above notes the dedicated key staff and their current/projected workloads. <br /> <br />H. ADDITIONAL INFORMATION <br />