Laserfiche WebLink
Jose D. Morales, PSM, cont’d. Resume <br />Maser Consulting P.A. <br />other subcontractors to resolve conflicts. He also used FDOT Roadway and Bridge Design Standards to make sure <br />construction was up to standard. <br /> <br />Right of Way Mapping <br />Project Surveyor for SR786/PGA Boulevard Control Survey and Genesis Maps (3 miles). Prepared right of way <br />control survey and genesis maps for State Road No. 786 (PGA Boulevard) according to FDOT district 4 guidelines <br />and standards. <br /> <br />Florida Department of Transportation, District 6 <br />Miami-Dade County, FL <br />R/W Control Survey <br />SR 5/US 1/South Dixie Highway (3 miles) <br />Responsible for coordinating GPS control and re-establishing the historical baseline of survey. Calculated right of <br />way and side street alignments and QA/QC of final deliverables <br /> <br />Design Surveys <br />SR 5/Overseas Highway (5 miles) <br />Mr. Morales was responsible for the crews and office technicians in setting project network control, Mobile LiDAR <br />control, QA/QC of LiDAR data, establishing the existing right of way and historical baseline of survey. <br />SR 976/Bird Road (2 miles) <br />Mr. Morales was responsible for the crews and office technicians in setting project network control, Mobile LiDAR <br />control, QA/QC of LiDAR data and survey design files, establishing the existing right of way and historical baseline <br />of survey. <br /> <br />SR A1A/Collins Avenue (2 miles) <br />Mr. Morales was the office project surveyor in charge of processing all the field EFB segments in CAiCE and <br />preparing the standard drainage, utilities, topo and DTM survey design files. He also established the existing right <br />of way and historical baseline. <br /> <br />R/W Monumentation <br />SR 5/Biscayne Boulevard (6 miles) <br />Project Surveyor in charge of setting Survey Control and managing office technicians. He was responsible for <br />making the necessary calculations and QA/QC for monumenting and preparing a Right of Way Monumentation <br />Map. <br /> <br />R/W Map <br />SR 997 Krome Avenue (5 miles) <br />Mr. Morales was in charge in supervising office technician in preparing Right of Way maps. He also reviewed 86 <br />title search reports and prepared 90 legal descriptions for parcel acquisitions. He communicated and coordinated <br />with the Design Engineer to make sure the project stayed on schedule. <br /> <br />CE&I <br />SR 997 Krome Avenue (5 miles) <br />In charge of coordinating field crews to obtain As-built information for subsoil excavation for the FDOT CEI efforts. <br /> <br />Florida Department of Transportation, District 5 <br />Orange County, FL <br />Design Survey <br />Project Surveyor for SR 417/Greenway Expressway Design survey (4 miles) <br />Project was a conglomerate of aerial, laser scanned and conventional surveying which in the end were seamed <br />together. Processed multiple crews’ EFB segments in CAiCE, level runs, traverse adjustments through least <br />squares as well as coordinated field crews day-to-day work. Prepared utilities, topographic, drainage and DTM <br />drawings per FDOT district 5 guidelines and standards <br /> <br />Section F, Page 17