|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />JOHN LIPTAK, PSM
<br />13. ROLE IN THIS CONTRACT
<br />Principal-in-Charge / Contract Manager
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />52
<br />b. WITH CURRENT FIRM
<br />15
<br />15. FIRM NAME AND LOCATION (City and State)
<br />MASER CONSULTING, INC. – Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Brookdale Community College
<br />Newark College of Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Surveyor & Mapper (PSM), Florida No.
<br />LS5664
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Professional Affiliations: Florida Survey & Mapping Society Board Member, 2008-Present; Miami-Dade County
<br />Chapter President 2000 & 2006; County Chapter Surveyor of the Year 2000-2001; American Congress of Survey &
<br />Mappers; National Society of Professional Surveyors; Florida Green Building Coalition, Member
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />West Avenue and Environs
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />The project is a topographic survey for West Avenue and Environs. The project area is bounded by 17th Street on
<br />the north, 8th Street on the south, Alton Road on the east and Biscayne Bay on the west. It includes approximately
<br />22,400 linear feet of roadway and an additional 1,200 linear feet of storm sewer outfall. Total cost of $191,545.18.
<br />Role: Contract Manager / Senior Project Surveyor.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />Phillip and Patricia Frost Science Museum
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Produced a final survey for the project was a Topographic or Design Survey for the areas outside the property lines
<br />or within the right of way of the adjacent public streets. The field work performed included a high definition 3D scan
<br />of the full corridor beginning 500 feet south of the NE 11th Street intersection continuing north, under the 836 East-
<br />West Expressway for approximately 750 feet. In support of the 3D scan additional location surveying was performed
<br />to verify/reset right of way, horizontal/vertical control based on the FDOT Right of Way Map for SR 5. GPS location
<br />surveying was also required to locate any above ground appearances obscured or not visible to the scanner. Role:
<br />Contract Manager / Senior Project Surveyor.
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />SR 976/Bird Road, Districtwide ROW Mapping & Survey (Contract
<br />C9J19), FDOT District 6, Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Design Survey and Project Control for SR 976/Bird Rd from SW 117th Ave. to SW 102nd Ave. includes the following:
<br />Establish Horizontal Project Control (HPC) on NAD83(1990 adjustment) and Vertical Project Control (VPC) on
<br />NAVD88; Recon and Locate occupation along SR 976/Bird Road in support of historical baseline and existing right
<br />of way; Create topographic survey and DTM with mobile lidar, extend 25 feet beyond r/w line or to building line;
<br />Locate above ground utilities, drainage & overhead structures; perform Check x-sections along SR 976/Bird Road
<br />every 500 ft; Recon and Locate occupation along side streets in support of centerline and existing right of way; Locate
<br />8 (1/4 or section) corners for future R/W mapping support; Calculate alignments and r/w; Prepare survey design files
<br />and Project Control sheets. Role: Contract Manager / Senior Project Surveyor .
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />SR 909/West Dixie Highway, Districtwide Miscellaneous
<br />Location Survey Consultant (C9R77), FDOT District 6
<br />Miami-Dade County, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If Applicable)
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm
<br />Provide Horizontal/Vertical Control and design survey files (DTM) for SR 909 from NE 2nd Avenue to NE 124th Street,
<br />in North Miami. DTM limits to be the RW line or back of walk, whichever is further, plus 1 shot. Includes the following:
<br />Recover & Verify existing Horizontal Project Control (HPC) for SR 909; Set new HPC & LiDAR targets on SR 909 as
<br />needed; and traverse as necessary to maintain NAD83/1990 coordinates; Establish Vertical Project Control (VPC) for
<br />Project Control points & LiDAR targets on NAVD88; Verify occupation in support of right of way and baseline
<br />alignment; Create topographic survey and DTM; Obtain vertical clearances to overhead utilities, mast arm details and
<br />trees & common name (≥ 4” Diameter at Breast Height); 3D topographic data to be acquired by static scanner;
<br />perform 6 check x-sections; Locate ±25 drainage structures; Provide Rim, Invert, Pipe size, type & direction; Calculate
<br />Section E, Page 20
|