Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />JOHN LIPTAK, PSM <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge / Contract Manager <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />52 <br />b. WITH CURRENT FIRM <br />15 <br />15. FIRM NAME AND LOCATION (City and State) <br />MASER CONSULTING, INC. – Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Brookdale Community College <br />Newark College of Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Surveyor & Mapper (PSM), Florida No. <br />LS5664 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Professional Affiliations: Florida Survey & Mapping Society Board Member, 2008-Present; Miami-Dade County <br />Chapter President 2000 & 2006; County Chapter Surveyor of the Year 2000-2001; American Congress of Survey & <br />Mappers; National Society of Professional Surveyors; Florida Green Building Coalition, Member <br />19. RELEVANT PROJECTS <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />West Avenue and Environs <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />The project is a topographic survey for West Avenue and Environs. The project area is bounded by 17th Street on <br />the north, 8th Street on the south, Alton Road on the east and Biscayne Bay on the west. It includes approximately <br />22,400 linear feet of roadway and an additional 1,200 linear feet of storm sewer outfall. Total cost of $191,545.18. <br />Role: Contract Manager / Senior Project Surveyor. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Phillip and Patricia Frost Science Museum <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Produced a final survey for the project was a Topographic or Design Survey for the areas outside the property lines <br />or within the right of way of the adjacent public streets. The field work performed included a high definition 3D scan <br />of the full corridor beginning 500 feet south of the NE 11th Street intersection continuing north, under the 836 East- <br />West Expressway for approximately 750 feet. In support of the 3D scan additional location surveying was performed <br />to verify/reset right of way, horizontal/vertical control based on the FDOT Right of Way Map for SR 5. GPS location <br />surveying was also required to locate any above ground appearances obscured or not visible to the scanner. Role: <br />Contract Manager / Senior Project Surveyor. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />SR 976/Bird Road, Districtwide ROW Mapping & Survey (Contract <br />C9J19), FDOT District 6, Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Design Survey and Project Control for SR 976/Bird Rd from SW 117th Ave. to SW 102nd Ave. includes the following: <br />Establish Horizontal Project Control (HPC) on NAD83(1990 adjustment) and Vertical Project Control (VPC) on <br />NAVD88; Recon and Locate occupation along SR 976/Bird Road in support of historical baseline and existing right <br />of way; Create topographic survey and DTM with mobile lidar, extend 25 feet beyond r/w line or to building line; <br />Locate above ground utilities, drainage & overhead structures; perform Check x-sections along SR 976/Bird Road <br />every 500 ft; Recon and Locate occupation along side streets in support of centerline and existing right of way; Locate <br />8 (1/4 or section) corners for future R/W mapping support; Calculate alignments and r/w; Prepare survey design files <br />and Project Control sheets. Role: Contract Manager / Senior Project Surveyor . <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />SR 909/West Dixie Highway, Districtwide Miscellaneous <br />Location Survey Consultant (C9R77), FDOT District 6 <br />Miami-Dade County, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If Applicable) <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm <br />Provide Horizontal/Vertical Control and design survey files (DTM) for SR 909 from NE 2nd Avenue to NE 124th Street, <br />in North Miami. DTM limits to be the RW line or back of walk, whichever is further, plus 1 shot. Includes the following: <br />Recover & Verify existing Horizontal Project Control (HPC) for SR 909; Set new HPC & LiDAR targets on SR 909 as <br />needed; and traverse as necessary to maintain NAD83/1990 coordinates; Establish Vertical Project Control (VPC) for <br />Project Control points & LiDAR targets on NAVD88; Verify occupation in support of right of way and baseline <br />alignment; Create topographic survey and DTM; Obtain vertical clearances to overhead utilities, mast arm details and <br />trees & common name (≥ 4” Diameter at Breast Height); 3D topographic data to be acquired by static scanner; <br />perform 6 check x-sections; Locate ±25 drainage structures; Provide Rim, Invert, Pipe size, type & direction; Calculate <br />Section E, Page 20