My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Maser Consulting, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(20-07-01) Continuing Professional Consulting Services (CCNA)
>
Responses
>
Maser Consulting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2020 10:05:37 AM
Creation date
8/21/2020 10:04:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S <br />QUALIFICATIONS FOR THIS CONTRACT <br />Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />3 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />I-95 at 95th Street, Districtwide Miscellaneous Location <br />Survey Consultant (C9R77), FDOT District 6 <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />9/2017 N/A <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER <br />FDOT District 6 Victor Marrero, PSM, District <br />Surveyor <br />305.470.5194 / <br />victorm.marrero@dot.state.fl.us <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Maser Consulting completed the Design Survey for NW <br />95th Street at the intersection with NW 6th Ave (I-95 <br />Northbound off/on ramps). The scope included the <br />following: Establish Horizontal Project Control (HPC) on <br />NAD83/2011; Set, GPS and traverse through Project <br />Control; Establish Vertical Project Control (VPC) on <br />NAVD88; Recon and Locate occupation along NW 95th <br />Street from NW 7th Avenue to NW 5th Ave and along NW <br />6th Ave from NW 94th Street to NW 95th Terrace, in <br />support of baseline and existing right of way; Create <br />topographic survey and DTM, limits being at the fence or <br />toe of slope pavement for bridges on the NW and SW <br />corners, to the building line on the SE corner and <br />10 feet into the property at the NE corner; Obtain <br />vertical clearances to overhead utilities, mast arm <br />details and trees & common name (≥ 4” Diameter <br />at Breast Height); 3D topographic data to be <br />acquired by static scanner; Check x-sections <br />along NW 95th Street and NW 6th Avenue; Top, <br />inverts, pipe sizes & directions for ± 5 drainage <br />structures; Calculate Baselines and right of way <br />for NW 95th Street and NW 6th Ave; Prepare <br />survey design files (Topo, Drainage, Utilities, <br />DTM); and Prepare Project Network Control <br />sheets. <br />Cost: $15,418.00 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />Maser Consulting Miami, FL Prime Consultant <br />b. <br />(1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />c. <br />(1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br />(1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE <br />Section E, Page 34
The URL can be used to link to this page
Your browser does not support the video tag.