Laserfiche WebLink
E-14Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />NW 12th Avenue Force Main Replacement, North Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Lead Designer/Manager responsible for the design, permitting, and construction of 10,500 LF of 10- and 12-inch replacement <br />force main in NW 12th Avenue extending from NW 95th Street to NW 125th Street. The project replaced aging, asbestos- <br />cement and cast iron force mains with corrosion resistant PVC pipe. A number of private force main connections required <br />relocation and reconnection to the new force main, as well as planning for uninterrupted service during construction. <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program (Phase II) & Associated <br />Force Mains, Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager/Engineer-of-Record leading the project team in providing engineering analysis and design services for <br />the upgrade of various sanitary sewer pump stations ranging in size from 300 GPM to 900 GPM. The project consists of <br />upgrading pump stations located throughout Miami-Dade County that have been identified as having deficient NAPOT <br />values. Jose analyzes each pump station, develops individual scopes and fee proposals for each station, coordinates all <br />team members prior to commencing work, and directs the design team in the engineering analysis, design development, <br />and preparation of construction documents. Since these projects occur in different municipalities, Jose personally manages <br />all permitting services to discuss each project with RER-DERM and to engage the proper building departments. Additionally, <br />Jose developed a system curve spreadsheet that allows staff engineers to analyze each pump station and facilitates in the <br />pump selection process. Pump Stations designed include: PS 609, PS 449, PS 147, PS 331, PS 440, PS 081, and PS 592. <br />F. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />D/B Replacement of Water Main & Service Conversions in “Donut Hole” <br />Area, Miami Gardens, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager for the replacement of the undersized and deteriorated water mains and existing main loop closures. The <br />project includes: ±22,450 LF of 8-inch ductile iron water main and pipe fittings: ±12,060 LF of 12-inch ductile iron water main <br />pipe and fittings; ±1,050 LF of 6-inch ductile iron water main pipe and fittings; and ±560 water service conversions from <br />rear of property to front of property. The project involved permitting both within the right-of-way and on private property. <br />The right-of-way permits included City and FDOT roadways. Developed procedure to execute water meter conversion, with <br />time spent analyzing, developing, and testing the mechanism by which the portion of the water meter conversions within <br />private property could be finalized. Extensive public outreach and MOT planning ensured a smooth construction process. <br />G. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Engineering, Design and Related Services for the Local Pump <br />Station Improvement Program, Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Manager/Engineer-of-Record leading the project team in providing the inspection/evaluation, analysis and design <br />of multiple sanitary sewer lift stations ranging from 20 HP to 60 HP and associated force mains. The challenges found <br />in designing these upgrades relate to two items. First, meeting the FEMA Base Flood Elevation for some of these small <br />locations while maintaining operations and maintenance protocols is a challenge. Under this contract, we have converted <br />several wet well / dry well systems into submersible stations. These conversions are requiring significant structural design <br />in order to reuse the existing facilities. This effort is more cost effective than installing a new wet well. Additionally, our <br />team looks carefully at constructability in developing creative solutions that meet all of the client’s needs while maximizing <br />construction dollars. Below are some of the pump stations awarded as task orders to CES under this contract: Design of <br />Pump Stations No. 673, No. 063, No. 659 No. 639 & Generator Replacement PS318, PS464 & PS475.