<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Gustavo Silva, PE Assistant Project Manager A. TOTAL B. WITH CURRENT FIRM
<br />8 5
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. Miami, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />BS Civil Engineering, Florida International University, 2012 FL Professional Engineer #86389
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certifications & Training: FDOT Intermediate Work Zone Traffic Control Certification #15002, FDOT CTQP, Asphalt Paving
<br />Technician Level 1, FDOT CTQP, Earthwork Technician Level 1, FDOT CTQP, QC Manager, Autodesk AutoCAD Civil 3D, NASSCO
<br />Pipeline Assessment (PACP), NASSCO Manhole Assessment (MACP); Member, American Society of Civil Engineers
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />MDWASD Pump Station Improvement Program (PSIP) & Associated
<br />Force Mains, Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Project Engineer, provided evaluation, cost, engineering analysis, design, coordination, permitting and management for
<br />the rehabilitation and replacement of multiple pump stations for the PSIP. The project consisted of existing pump station
<br />inspection, coordination of survey and geotechnical services, design of pump station rehabilitation or replacement, design
<br />of connecting force mains, permitting, and limited construction services. The engineering work included PS 0449, PS 0147,
<br />PS 0331, Force Main 0592 (24-inch), PS 0440, PS 0336, PS 0609, PS 0081, PS 1026 and PS 1065.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Ave. North & South Neighborhood Utility & Resiliency
<br />Improvements Design-Build Projects, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer for the $72M Design-Build projects to develop a stormwater model, water/sewer/utility and roadway
<br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue
<br />Basin. This resiliency project will provide the community protection from flooding during storm events and high seasonal
<br />tides. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no
<br />structure flooding. The contributing basin is 600 acres and all 12 utilities along the roadway will be affected. Modeling using
<br />AdICPR4 and upsizing and design of all curb inlets and yard inlets followed by significant upsizing and modifications of two
<br />pumps stations is required. The project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of
<br />storm sewer, a 120,000 GPM stormwater pump station and outfall, and water meter service conversions from the rear of
<br />private properties to new water lines and connections in the right-of-way.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />D/B Water Main Replacement & Service Conversions in the Shenandoah
<br />Area, Phase B, Miami, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Design Support Engineer responsible for residential plumbing permit documentation and coordination and CADD
<br />Coordinator for the D/B upgrade of 46,000 LF of water main. The project consisted of upgrading existing 4-inch and 6-inch
<br />residential water main to 8-inch water mains. The project wet tap connections include 8-inch, 16-inch and 24-inch pipes
<br />Additionally, relocated 650 residential water mains at rear property easements to right-of-way.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Miramar Infrastructure Improvements & Service Conversions, Phase III,
<br />Miramar, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Engineer providing construction management and inspection services for the upgrade of approximately 72,000 LF
<br />of water main. The project consisted of upgrading existing 2-inch and 4-inch residential water mains to 6-inch, 8-inch and
<br />12-inch water mains, as well as the installation of fire hydrants, throughout the historic neighborhood.
|