Laserfiche WebLink
E-15Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Gustavo Silva, PE Assistant Project Manager A. TOTAL B. WITH CURRENT FIRM <br />8 5 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. Miami, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />BS Civil Engineering, Florida International University, 2012 FL Professional Engineer #86389 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certifications & Training: FDOT Intermediate Work Zone Traffic Control Certification #15002, FDOT CTQP, Asphalt Paving <br />Technician Level 1, FDOT CTQP, Earthwork Technician Level 1, FDOT CTQP, QC Manager, Autodesk AutoCAD Civil 3D, NASSCO <br />Pipeline Assessment (PACP), NASSCO Manhole Assessment (MACP); Member, American Society of Civil Engineers <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program (PSIP) & Associated <br />Force Mains, Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />As Project Engineer, provided evaluation, cost, engineering analysis, design, coordination, permitting and management for <br />the rehabilitation and replacement of multiple pump stations for the PSIP. The project consisted of existing pump station <br />inspection, coordination of survey and geotechnical services, design of pump station rehabilitation or replacement, design <br />of connecting force mains, permitting, and limited construction services. The engineering work included PS 0449, PS 0147, <br />PS 0331, Force Main 0592 (24-inch), PS 0440, PS 0336, PS 0609, PS 0081, PS 1026 and PS 1065. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West Ave. North & South Neighborhood Utility & Resiliency <br />Improvements Design-Build Projects, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer for the $72M Design-Build projects to develop a stormwater model, water/sewer/utility and roadway <br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue <br />Basin. This resiliency project will provide the community protection from flooding during storm events and high seasonal <br />tides. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no <br />structure flooding. The contributing basin is 600 acres and all 12 utilities along the roadway will be affected. Modeling using <br />AdICPR4 and upsizing and design of all curb inlets and yard inlets followed by significant upsizing and modifications of two <br />pumps stations is required. The project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of <br />storm sewer, a 120,000 GPM stormwater pump station and outfall, and water meter service conversions from the rear of <br />private properties to new water lines and connections in the right-of-way. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />D/B Water Main Replacement & Service Conversions in the Shenandoah <br />Area, Phase B, Miami, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Design Support Engineer responsible for residential plumbing permit documentation and coordination and CADD <br />Coordinator for the D/B upgrade of 46,000 LF of water main. The project consisted of upgrading existing 4-inch and 6-inch <br />residential water main to 8-inch water mains. The project wet tap connections include 8-inch, 16-inch and 24-inch pipes <br />Additionally, relocated 650 residential water mains at rear property easements to right-of-way. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miramar Infrastructure Improvements & Service Conversions, Phase III, <br />Miramar, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer providing construction management and inspection services for the upgrade of approximately 72,000 LF <br />of water main. The project consisted of upgrading existing 2-inch and 4-inch residential water mains to 6-inch, 8-inch and <br />12-inch water mains, as well as the installation of fire hydrants, throughout the historic neighborhood.