Laserfiche WebLink
E-19Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Wastewater Collection Systems, Various Locations, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2020 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project/Program Manager for management and design of a variety of wastewater pump/lift stations and collection <br />systems involving clay, PVC, ductile iron, HDPE, Drisco, and prestressed and reinforced concrete pipe for sewers ranging <br />from municipal sanitary to industrial ink press washwater to papermill acid. Lead civil design engineer for an entire <br />nuclear power plant site, two auto assembly plants (Buick Division of GM) and numerous office/commercial complexes <br />and residential subdivisions. Was integrally involved in the review, design, repair, rehabilitation, installation, and QA/QC of <br />various pump/lift/pump stations for sanitary and industrial sewer systems, which included civil, structural, mechanical and <br />electrical disciplines, and the use of trenchless technologies, horizontal directional drilling, slip-lining, pipe-bursting and <br />traditional dig-and-replace construction methods. Designed and installed various types and depths of manholes involving <br />sealants, coatings and water-tight products. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />MDWASD Pump Station Improvement Program (PSIP) & Associated <br />Force Mains, Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />As Project Director/Technical Advisor, provided project oversight and guidance for scope and fee development, client <br />coordination, site & system evaluation for cost, engineering analysis, design, coordination, permitting and management for <br />the rehabilitation and replacement of multiple pump stations for the PSIP. The project consisted of existing pump station <br />inspection, coordination of survey and geotechnical services, design of pump station rehabilitation or replacement, design <br />of connecting force mains, permitting, and limited construction services. The engineering work included PS 0449, PS 0147, <br />PS 0331, Force Main 0592 (24-inch), PS 0440, PS 0336, PS 0609, PS 0081, PS 1026 and PS 1065. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />NW 12th Avenue Force Main Replacement, North Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />QA/QC for the design, permitting, and construction of 10,500 LF of 10- and 12-inch replacement force main in NW 12th <br />Avenue extending from NW 95th Street to NW 125th Street. The project replaced aging, asbestos-cement and cast iron force <br />mains with corrosion resistant PVC pipe. A number of private force main connections required relocation and reconnection <br />to the new force main, as well as planning for uninterrupted service during construction. <br />E. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Water Distribution Systems, Various Locations, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Program/Project Manager for management and design of water distribution and treatment systems for residential <br />subdivisions, office complexes, shopping malls, small cities, municipal improvements/ rehabilitations, major airports and <br />U.S. Corps of Engineers. Projects included hydraulic modeling and system evaluation; large diameter and raw water intake <br />piping and structures; 18” - 48” transmission mains; private and public distribution piping; pumping stations; 250,000-gallon <br />to 5-MG water storage tanks (ground and elevated); and treatment plant expansion/ modifications involving reverse <br />osmosis, sand and media filters, clear wells, lime softening facilities and flocculation basins. <br />F. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Palm Beach County Water Utilities Department Looping Project, <br />Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />QA/QC for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including DIP, PVC and <br />HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new interconnections <br />improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention time, resulting in <br />improved water quality. Directional Drilling was designed for major intersections and tree lined corridors. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2