<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Bud Goblisch, PE Vice President; Sr. Construction
<br />Manager & CEI
<br />A. TOTAL B. WITH CURRENT FIRM
<br />41 5
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. West Palm Beach, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />BS Civil Engineering, University of Illinois, 1978 FL Professional Engineer #62156
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Bud Goblisch is a Vice President and Senior Project Manager for CES Consultants. With over 40 years of engineering and
<br />construction inspection and management experience, Bud has extensive knowledge of what it takes to complete work on time
<br />and budget for resident engineering projects. He recognizes the importance of being responsive to the City’s needs and of
<br />being flexible and creative to deliver the most cost-effective solutions to project challenges.
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Palm Beach County Water Utilities Department Looping Project,
<br />Palm Beach County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Principal in Charge for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including
<br />DIP, PVC and HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new
<br />interconnections improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention
<br />time, resulting in improved water quality. Directional Drilling was designed for major intersections and tree lined corridors.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD C-4 Canal Bank Improvements Flood Protection Berm,
<br />Sweetwater, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Project Director/Sr. Project Manager, provided full time construction inspection services. Bud oversaw a full time
<br />Field Engineer to inspect the work and manage the materials testing for the project. The project included the removal
<br />of vegetation and encroachments from within the District’s easements, the construction of a reinforced earthen berm,
<br />stormwater collection and disposal structures, and vehicular access gates. This project required significant coordination
<br />with the residents on the canal as many had encroached on the District’s right-of-way with structures, pools and patios.
<br />All had to be removed. The work was completed on time and under budget.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD L-8 Dupuis Culvert Replacements, Martin County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Principal in Charge, managed the full time resident inspector to oversee the construction and run the project meetings
<br />and signed and sealed the Certificates of Construction Completion at the G-263, G-261 and G-262 sites.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD C-4 Canal Bank Improvements Flood Protection Berm,
<br />Palmetto, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Project Director/Sr. Project Manager, provided full time construction inspection services. This project made improvements
<br />to the canal to improve drainage and to provide improved flood protection to residents. The work included clearing the
<br />right-of-way completely of illegal structures and vegetation, hardening the canal bank with fill and a limerock base, High
<br />Performance Turf Reinforcing Mats, and sodding, as well as environmental and turbidity monitoring. CES performed on-site
<br />representation to observe and document the construction and to assist the DPM in determining if the work was performed
<br />according to the plans and specifications. This included reviewing and responding to shop drawing submittals, Requests for
<br />Information, Change Orders, Field Orders and Value Engineering proposals. It also required CES to provide Record Drawings
<br />and a Construction Certificate of Completion at the end of the project, signed and sealed by a Florida Professional Engineer.
<br />Informing residents of the work that had to be completed was a daily effort and the most challenging part of the project.
|