E-21Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Washington Road Utilities & Stormwater Outfall Improvement,
<br />West Palm Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Principal-in-Charge for design of new stormwater conveyance, replacement watermain, and replacement sanitary sewer
<br />mains and manholes. The stormwater conveyance and management system will include curb and gutter, piping up to
<br />60” RCP, sediment and floatable baffle box, a 30cfs pump station to handle King Tide flooding, and gravity outfall to the
<br />Intracoastal Waterway. The project also entails the redesign of the road cross section to include new sidewalks, driveways
<br />and bike lanes along with raised intersections and roundabouts for traffic calming, all while preserving the trees along the
<br />project corridor. CES is also providing neighborhood outreach to this very high-profile part of the City. The project also
<br />includes new water mains and sewer collection system. Cost: $6M
<br />F.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD C-23, C-25, S-48 & S-50 Canal Bank Stabilizations,
<br />St. Lucie County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2020 2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Director/Sr. Project Manager for Construction Inspection Services for bank stabilization projects at these various
<br />locations. Work included installing new sheet piles, bank regrading and stabilization fabric underlayment, rip rap placement,
<br />and installing marine mattresses in two of the canals. The work included full time inspection to examine constructions
<br />activities in accordance with the contract documents. Also provided signed and sealed Completion Certification certificates.
<br />Cost: $8M
<br />G.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD S-351 & S-354, Belle Glade, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Director/Sr. Project Engineer for construction phase support for the Lifting Mechanisms for Manatee Protection
<br />Barriers. The project consists of the construction of structural steel frame and underhung double girder bridge crane system
<br />that houses a 7.5-ton hoist lifting mechanism to efficiently remove and replace the Manatee Protection Barrier Grates at
<br />these two spillways. The effort included full time inspection, meeting management, daily reports, pay application approval
<br />and photographic documentation of the work Cost: $800k
<br />H.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Boynton Beach West Water Treatment Plant Improvements, Phase IV,
<br />Boynton Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2010 2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />City’s Representative responsible for oversight of construction activities to upgrade the Water Treatment Plant, including
<br />submittal processing, RFIs, payment applications, change order review and approval, and managing the on-site resident
<br />project representative. Cost: $6M
<br />I.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Water Treatment Plant Consent Program, West Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Interim Program Manager as the consent items were being closed out and the firm role was transitioning into more of a
<br />design engineer. All of the consent items were closed on or before their deadline date except for the requirement to change
<br />the plant to a membrane facility. That process was being evaluated. Cost: $150M
<br />J.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD PC Culvert Replacements, Various locations in SE Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2020 2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Project Director/Sr. Project Manager for the rehabilitation/replacement of over 20 culvert structures in the District’s system.
<br />The work included construction inspection of the new installations to make sure it conformed to the contract documents,
<br />including the geotechnical testing. Scheduled the part time inspection and material testing at the District’s request.
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 2
|