Laserfiche WebLink
E-22Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Ernest Cano Principal; Construction Manager A. TOTAL B. WITH CURRENT FIRM <br />40+2+ <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. Miami & Pembroke Pines, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />BS, Civil Engineering, Florida International University; BS, Electrical <br />Engineering, University of Miami; AA, Architecture, Miami-Dade College <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Member, Institute of Electrical Electronic Engineers; Member, American Society of Civil Engineers; Member, National Society <br />of Professional Engineers; Member, Cuban Engineering Society; Member, Save International <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami-Dade Water and Sewer Department Consent Decree Program, <br />Miami-Dade County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />As the Area Construction Manager/Utility & Easement Coordinator overseeing work under the County’s $1.6B program <br />consisting of dozens of projects and including over 40 pump stations, 50 miles of force/gravity main lines, and a 96” <br />diameter tunnel from Virginia Key to Fisher Island. Ernie provided oversight of projects being directly managed by the <br />Client, supervised construction managers, and personally managed consent decree program projects. Ernie worked with <br />Construction Managers, Project Engineers and Field Inspectors to ensure that this highly complex program was delivered <br />within budget and on-schedule. In addition to customary construction management responsibilities, Ernie was responsible <br />for coordination of all design quality control of projects designed by outside consultants and in-house, permitting, utility <br />coordination, and US EPA compliance certification. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West Ave. North & South Neighborhood & Resiliency Improvements D/B <br />Projects, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Construction Manager for the $72M D/B projects to develop a stormwater model, water/sewer/utility and roadway <br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue <br />Basin. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no <br />structure flooding. Project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of storm sewer <br />and a 120,000 GPM stormwater pump station and outfall. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Pump Station Improvements, Refurbishments, Scada Technology & <br />Force Main Valve Replacement Florida City, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Construction Manager This project consists of upgrades to and refurbishment of City of Florida City Sewer Pumping Stations <br />No. 2, 3, 4, 7, 10, 11, 12, 14, 16, 17, 18, 20, 22, 23, 24, 25, 26, 27 & 29. The work included installation of isolation valves in the <br />force main system, water and force main upgrades, and SCADA Improvements. $1.356M <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Miami International Airport North Terminal Development, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2014 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Senior Program Construction Manager/Utility & Easement Coordinator for the MIA/American Airlines joint $3.9B North <br />Terminal Development Program consisting of 3.2M SF of construction and 48 new aircraft gates. The Program was a multi- <br />phase construction program segregated into 56 distinct projects. Ernie was responsible for leading Senior Project and <br />Design Managers to ensure that all projects were maintained within budget and on-schedule providing utility coordination <br />and permitting support. Other responsibilities included coordination of all Design/Construction Quality Control and Safety <br />Programs, and reporting any unanticipated chances in the scope that could alter the critical path of the overall program <br />activities. Directly responsible for overseeing the Managing GC contract and ensuring timely payments for completed work. <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2