E-22Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Ernest Cano Principal; Construction Manager A. TOTAL B. WITH CURRENT FIRM
<br />40+2+
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. Miami & Pembroke Pines, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />BS, Civil Engineering, Florida International University; BS, Electrical
<br />Engineering, University of Miami; AA, Architecture, Miami-Dade College
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Member, Institute of Electrical Electronic Engineers; Member, American Society of Civil Engineers; Member, National Society
<br />of Professional Engineers; Member, Cuban Engineering Society; Member, Save International
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Miami-Dade Water and Sewer Department Consent Decree Program,
<br />Miami-Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As the Area Construction Manager/Utility & Easement Coordinator overseeing work under the County’s $1.6B program
<br />consisting of dozens of projects and including over 40 pump stations, 50 miles of force/gravity main lines, and a 96”
<br />diameter tunnel from Virginia Key to Fisher Island. Ernie provided oversight of projects being directly managed by the
<br />Client, supervised construction managers, and personally managed consent decree program projects. Ernie worked with
<br />Construction Managers, Project Engineers and Field Inspectors to ensure that this highly complex program was delivered
<br />within budget and on-schedule. In addition to customary construction management responsibilities, Ernie was responsible
<br />for coordination of all design quality control of projects designed by outside consultants and in-house, permitting, utility
<br />coordination, and US EPA compliance certification.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Ave. North & South Neighborhood & Resiliency Improvements D/B
<br />Projects, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Construction Manager for the $72M D/B projects to develop a stormwater model, water/sewer/utility and roadway
<br />design, permitting and infrastructure construction of 1.2 miles of roadway to address sea level rise in the West Avenue
<br />Basin. The project requires raising the roadway approximately 30 inches while providing a 10-year level of service with no
<br />structure flooding. Project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of storm sewer
<br />and a 120,000 GPM stormwater pump station and outfall.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Pump Station Improvements, Refurbishments, Scada Technology &
<br />Force Main Valve Replacement Florida City, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Construction Manager This project consists of upgrades to and refurbishment of City of Florida City Sewer Pumping Stations
<br />No. 2, 3, 4, 7, 10, 11, 12, 14, 16, 17, 18, 20, 22, 23, 24, 25, 26, 27 & 29. The work included installation of isolation valves in the
<br />force main system, water and force main upgrades, and SCADA Improvements. $1.356M
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Miami International Airport North Terminal Development, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Senior Program Construction Manager/Utility & Easement Coordinator for the MIA/American Airlines joint $3.9B North
<br />Terminal Development Program consisting of 3.2M SF of construction and 48 new aircraft gates. The Program was a multi-
<br />phase construction program segregated into 56 distinct projects. Ernie was responsible for leading Senior Project and
<br />Design Managers to ensure that all projects were maintained within budget and on-schedule providing utility coordination
<br />and permitting support. Other responsibilities included coordination of all Design/Construction Quality Control and Safety
<br />Programs, and reporting any unanticipated chances in the scope that could alter the critical path of the overall program
<br />activities. Directly responsible for overseeing the Managing GC contract and ensuring timely payments for completed work.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|