Laserfiche WebLink
E-37Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jocelyn Roman Staff Engineer/CADD A. TOTAL B. WITH CURRENT FIRM <br />9 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />MEng Construction Engineering & Management, Department of Civil <br />Engineering, University of Puerto Rico; BS Civil Engineering, Department of <br />Civil Engineering, University of Puerto Rico <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certifications: Project Management Integrated Project of Civil Engineering Capstone, OSHA 30-Hours Construction Safety <br />& Health, AutoCAD ACI; Software: Oracle Primavera Contract Management, Trimble’s e-Builder, SaaS-based Construction <br />Program Management Solution, Expedition <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Washington Road Utilities & Stormwater Outfall Improvement, <br />West Palm Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer for design of new stormwater conveyance, replacement watermain, and replacement sanitary sewer mains <br />and manholes. The stormwater conveyance and management system will include curb and gutter, piping up to 60” RCP, <br />sediment and floatable baffle box, a 30cfs pump station to handle King Tide flooding, and gravity outfall to the Intracoastal <br />Waterway. The project also entails the redesign of the road cross section to include new sidewalks, driveways and bike lanes <br />along with raised intersections and roundabouts for traffic calming, all while preserving the trees along the project corridor. <br />CES is also providing neighborhood outreach to this very high-profile part of the City. The project also includes new water <br />mains and sewer collection system. Cost: $6M <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Palm Beach County Water Utilities Department Looping Project, <br />Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including <br />DIP, PVC and HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new <br />interconnections improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention <br />time, resulting in improved water quality. Directional Drilling was designed for critical areas such as major intersections <br />and tree lined corridors. Conducted design team meetings; presented and recorded progress meetings; set up site visits; <br />reviewed and researched existing data; coordinated with utilities; coordinated with other County projects; managed the <br />Survey, Geotechnical and Utility Location subconsultant activities; and led the design team through the 30, 60, 90 and 100% <br />submittal phases, permitting documents, and bidding and construction phase services <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD Manatee Gate Controls, Broward & Miami-Dade Counties, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Project Engineer for design of the control panels at 18 different locations throughout southeast Florida to protect the <br />Manatees from being caught in a gate that is closing. If during the closing operation of a water control gate a Manatee is <br />detected, the gate will re-open and wait a certain amount of time before trying to close again. This design also includes <br />stilling wells, both upstream and downstream of the gate structure and the associated civil work. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD G-310, G335, G-370 and G372 Tower Grounding Modifications, <br />Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />This project consists on the installation of a complete Lighting Protection System for the pump stations G310, G370 and <br />G372. <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2