E-36Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Jose “Rafa” Castro, EI, ENV SP Project Engineer & Designer; CA & CEI
<br />Inspector
<br />A. TOTAL B. WITH CURRENT FIRM
<br />5 2
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. Pembroke Pines & West Palm Beach, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />MS Engineering in Renewable Energy, Institut National des Sciences
<br />Appliquées de Rouen; BS Civil Engineering, Instituto Tecnologico de Santo
<br />Domingo
<br />FL Engineer Intern
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Envision Sustainability Professional, Institute for Sustainable Infrastructure; Member, American Society of Civil Engineers;
<br />Software: Oracle Primavera Contract Management; Trimble’s e-Builder, SaaS-based Construction Program Management
<br />Solution; Expedition
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Palm Beach County Water Utilities Department Looping Project,
<br />Palm Beach County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2018 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Staff Engineer for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including DIP, PVC
<br />and HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new interconnections
<br />improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention time, resulting in
<br />improved water quality. Directional Drilling was designed for major intersections and tree lined corridors.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Washington Road Utilities & Stormwater Outfall Improvement,
<br />West Palm Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Staff Engineer for design of new stormwater conveyance, replacement watermain, and replacement sanitary sewer mains
<br />and manholes. The stormwater conveyance and management system will include curb and gutter, piping up to 60” RCP,
<br />sediment and floatable baffle box, a 30cfs pump station to handle King Tide flooding, and gravity outfall to the Intracoastal
<br />Waterway. The project also entails the redesign of the road cross section to include new sidewalks, driveways and bike lanes
<br />along with raised intersections and roundabouts for traffic calming, all while preserving the trees along the project corridor.
<br />CES is also providing neighborhood outreach to this very high-profile part of the City. The project also includes new water
<br />mains and sewer collection system. Cost: $6M
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />West Ave. North & South Neighborhood & Resiliency Improvements
<br />Design-Build Projects, Miami Beach, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Staff Engineer for review and evaluation of two existing hydraulic models and development of an updated Stormwater and
<br />Hydraulic Model of the West Ave Project Basin that included the impacts of the City’s 600-acre Basin from the project east
<br />to the Atlantic Ocean. Modeled using AdICPR4 and included upsizing and design of all curb inlets and yard inlets followed
<br />by significant upsizing and modifications of two pump stations. Created stormwater model and developed a pre vs. post
<br />scenario, along with three alternative stormwater models. The model considered the proposed roadway elevation and the
<br />actual finish floors of each existing structure. A hydraulic grade line was developed and maintained at one foot below the
<br />lowest finish floor elevation. The project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of
<br />storm sewer and a 120,000 GPM stormwater pump station and outfall. Cost: $72M
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD FS-351 & S-354 Lifting Mechanism for Manatee Protection
<br />Barrier, Palm Beach County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Site Inspector & Assistant Project Manager for the $947k retrofit of the S-351 and S-354 spillways with 1900 SF of steel
<br />frame and an underhung double girder bridge crane system that houses a 7.5-ton hoist for the manatee grates.
|