Laserfiche WebLink
E-36Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Jose “Rafa” Castro, EI, ENV SP Project Engineer & Designer; CA & CEI <br />Inspector <br />A. TOTAL B. WITH CURRENT FIRM <br />5 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. Pembroke Pines & West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />MS Engineering in Renewable Energy, Institut National des Sciences <br />Appliquées de Rouen; BS Civil Engineering, Instituto Tecnologico de Santo <br />Domingo <br />FL Engineer Intern <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Envision Sustainability Professional, Institute for Sustainable Infrastructure; Member, American Society of Civil Engineers; <br />Software: Oracle Primavera Contract Management; Trimble’s e-Builder, SaaS-based Construction Program Management <br />Solution; Expedition <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Palm Beach County Water Utilities Department Looping Project, <br />Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2018 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Staff Engineer for the rehabilitation of 16,000 LF of water main pipelines of varying sizes from 4” to 12” including DIP, PVC <br />and HDPE at 19 locations across Palm Beach County. Installation of the new segments of waterline and new interconnections <br />improved system capacity and hydraulic efficiencies, eliminated dead-ends, and reduced water retention time, resulting in <br />improved water quality. Directional Drilling was designed for major intersections and tree lined corridors. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Washington Road Utilities & Stormwater Outfall Improvement, <br />West Palm Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Staff Engineer for design of new stormwater conveyance, replacement watermain, and replacement sanitary sewer mains <br />and manholes. The stormwater conveyance and management system will include curb and gutter, piping up to 60” RCP, <br />sediment and floatable baffle box, a 30cfs pump station to handle King Tide flooding, and gravity outfall to the Intracoastal <br />Waterway. The project also entails the redesign of the road cross section to include new sidewalks, driveways and bike lanes <br />along with raised intersections and roundabouts for traffic calming, all while preserving the trees along the project corridor. <br />CES is also providing neighborhood outreach to this very high-profile part of the City. The project also includes new water <br />mains and sewer collection system. Cost: $6M <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />West Ave. North & South Neighborhood & Resiliency Improvements <br />Design-Build Projects, Miami Beach, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Staff Engineer for review and evaluation of two existing hydraulic models and development of an updated Stormwater and <br />Hydraulic Model of the West Ave Project Basin that included the impacts of the City’s 600-acre Basin from the project east <br />to the Atlantic Ocean. Modeled using AdICPR4 and included upsizing and design of all curb inlets and yard inlets followed <br />by significant upsizing and modifications of two pump stations. Created stormwater model and developed a pre vs. post <br />scenario, along with three alternative stormwater models. The model considered the proposed roadway elevation and the <br />actual finish floors of each existing structure. A hydraulic grade line was developed and maintained at one foot below the <br />lowest finish floor elevation. The project includes 16,000 LF of water main, 7,050 LF of sanitary gravity sewer, 12,800 LF of <br />storm sewer and a 120,000 GPM stormwater pump station and outfall. Cost: $72M <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD FS-351 & S-354 Lifting Mechanism for Manatee Protection <br />Barrier, Palm Beach County, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Site Inspector & Assistant Project Manager for the $947k retrofit of the S-351 and S-354 spillways with 1900 SF of steel <br />frame and an underhung double girder bridge crane system that houses a 7.5-ton hoist for the manatee grates.