E-39Proven solutionsResponsive and dependable performance
<br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA)
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Harry Price Construction Management,
<br />Inspections & EDC; Inspector
<br />A. TOTAL B. WITH CURRENT FIRM
<br />35+3
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. West Palm Beach, FL
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline)
<br />General Education Diploma, 1978
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Certifications: ACI Concrete Field Testing Technician Grade 1, ACI Concrete Construction Special Inspector, OSHA 10-Hour
<br />Safety Training
<br />19. RELEVANT PROJECTS
<br />A.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD L-8 Dupuis Culverts Replacement, Martin County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />On-site Field Representative/Resident Inspector for construction management, including project documentation control,
<br />running meetings, and providing signed and sealed Construction Certificates of Completion for the replacement of the
<br />G-261, G-262 and G-263 Structures, metal culverts running through a Federal Levee.
<br />B.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />East Miramar Redevelopment Transmission & Distribution Water Main
<br />Improvements, Phase 3, Miramar, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2019 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />Resident Inspector responsible for managing construction activities of the project, which entailed the installation of water
<br />mains, in line valves, fire hydrants and water services for residents in the City of Miramar. Responsible for reviewing and
<br />approving contractor’s shop drawings, method of statement and material submittals. Attended project progress meeting
<br />with the client and contractor. Reviewed contractor’s payment certificate as per the bill of quantities.
<br />C.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD C-4 Canal Bank Improvements Flood Protection Berm,
<br />Palmetto, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2017 2017
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Inspector, provided construction inspection services for this project, which made improvements to the canal to improve
<br />drainage and to provide improved flood protection to residents. The work included clearing the right-of-way completely of
<br />illegal structures and vegetation, hardening the canal bank with fill and a limerock base, High Performance Turf Reinforcing
<br />Mats, and sodding, as well as environmental and turbidity monitoring. CES performed on-site representation to observe
<br />and document the construction and to assist the DPM in determining if the work was performed according to the plans
<br />and specifications. This included reviewing and responding to shop drawing submittals, Requests for Information, Change
<br />Orders, Field Orders and Value Engineering proposals. It also required CES to provide Record Drawings and a Construction
<br />Certificate of Completion at the end of the project, signed and sealed by a Florida Professional Engineer. Informing residents
<br />of the work that had to be completed was a daily effort and the most challenging part of the project.
<br />D.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SFWMD C-4 Canal Bank Improvements Flood Protection Berm,
<br />Sweetwater, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />As Inspector, provided construction inspection services for this project, which included the removal of vegetation and
<br />encroachments from within the District’s easements, the construction of a reinforced earthen berm, stormwater collection
<br />and disposal structures, and vehicular access gates. This project required significant coordination with the residents on
<br />the canal as many had encroached on the District’s right-of-way with structures, pools and patios, all of which had to be
<br />removed. The work included clearing the right-of-way completely of illegal structures and vegetation, hardening the canal
<br />bank with fill and a limerock base, High Performance Turf Reinforcing Mats, and sodding, as well as environmental and
<br />turbidity monitoring. Performed on-site representation to observe and document the construction and to assist the DPM in
<br />determining if the work was performed according to the plans and specifications.
|