Laserfiche WebLink
E-39Proven solutionsResponsive and dependable performance <br />City of Sunny Isles Beach RFQ No. 20-07-01: Continuing Professional Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Harry Price Construction Management, <br />Inspections & EDC; Inspector <br />A. TOTAL B. WITH CURRENT FIRM <br />35+3 <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. West Palm Beach, FL <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State & Discipline) <br />General Education Diploma, 1978 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Certifications: ACI Concrete Field Testing Technician Grade 1, ACI Concrete Construction Special Inspector, OSHA 10-Hour <br />Safety Training <br />19. RELEVANT PROJECTS <br />A. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD L-8 Dupuis Culverts Replacement, Martin County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />On-site Field Representative/Resident Inspector for construction management, including project documentation control, <br />running meetings, and providing signed and sealed Construction Certificates of Completion for the replacement of the <br />G-261, G-262 and G-263 Structures, metal culverts running through a Federal Levee. <br />B. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />East Miramar Redevelopment Transmission & Distribution Water Main <br />Improvements, Phase 3, Miramar, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2019 2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Resident Inspector responsible for managing construction activities of the project, which entailed the installation of water <br />mains, in line valves, fire hydrants and water services for residents in the City of Miramar. Responsible for reviewing and <br />approving contractor’s shop drawings, method of statement and material submittals. Attended project progress meeting <br />with the client and contractor. Reviewed contractor’s payment certificate as per the bill of quantities. <br />C. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD C-4 Canal Bank Improvements Flood Protection Berm, <br />Palmetto, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2017 2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />As Inspector, provided construction inspection services for this project, which made improvements to the canal to improve <br />drainage and to provide improved flood protection to residents. The work included clearing the right-of-way completely of <br />illegal structures and vegetation, hardening the canal bank with fill and a limerock base, High Performance Turf Reinforcing <br />Mats, and sodding, as well as environmental and turbidity monitoring. CES performed on-site representation to observe <br />and document the construction and to assist the DPM in determining if the work was performed according to the plans <br />and specifications. This included reviewing and responding to shop drawing submittals, Requests for Information, Change <br />Orders, Field Orders and Value Engineering proposals. It also required CES to provide Record Drawings and a Construction <br />Certificate of Completion at the end of the project, signed and sealed by a Florida Professional Engineer. Informing residents <br />of the work that had to be completed was a daily effort and the most challenging part of the project. <br />D. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SFWMD C-4 Canal Bank Improvements Flood Protection Berm, <br />Sweetwater, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2016 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />As Inspector, provided construction inspection services for this project, which included the removal of vegetation and <br />encroachments from within the District’s easements, the construction of a reinforced earthen berm, stormwater collection <br />and disposal structures, and vehicular access gates. This project required significant coordination with the residents on <br />the canal as many had encroached on the District’s right-of-way with structures, pools and patios, all of which had to be <br />removed. The work included clearing the right-of-way completely of illegal structures and vegetation, hardening the canal <br />bank with fill and a limerock base, High Performance Turf Reinforcing Mats, and sodding, as well as environmental and <br />turbidity monitoring. Performed on-site representation to observe and document the construction and to assist the DPM in <br />determining if the work was performed according to the plans and specifications.